• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

A UK rail network challenge?

Status
Not open for further replies.

trevwilliams

Member
Joined
22 Feb 2012
Messages
54
Location
Ireland
Having just read about the London Underground Challenge on wiki I started wondering whether a similar attempt could be made, or has been made, on the uk rail network. I'm aware that the lt would require a few more packed lunches but what a project!!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

telstarbox

Established Member
Joined
23 Jul 2010
Messages
6,365
Location
Wennington Crossovers
Some stations are only served one day per week (or by one train per week) so it would take a lot of days to get the whole network done!
 

Yew

Established Member
Joined
12 Mar 2011
Messages
7,214
Location
UK
telstarbox:1445032 said:
Some stations are only served one day per week (or by one train per week) so it would take a lot of days to get the whole network done!

I don't have much planned this sumer anyway :D.
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
If you only needed to do each line once (i.e. in one direction only) and omitted PSULs (Passenger Services over Unusual Lines) then I reckon with a lot of planning you might be able to do the entire thing sub-2 weeks.
 

tractakid

Member
Joined
12 Nov 2012
Messages
852
Location
Milton Keynes
What counts? The tube challenge is fairly clear, but would the same rules fit exactly for the UK network?

The main difference I feel is request stops. Pass throughs are only allowed on the tube challenge in unforseen circumstances, any normal fast services aren't allowed. For example, passing through Turnham Green on a daytime Piccadilly line train would not count, as it doesn't stop there, even though the line does at the extremes of the day.

Must a train stop at each request stop, or is passing through a station that is scheduled but not requested legitimate?

It must also be decided what counts as 'one station' or 'two stations'. On the tube Paddington, Hammersmith and Edgware Road all have 2 stations that both need to be called at. On the NR network what about high and low level stations? Must Shotton be visited by train at both levels? Then you've got Heath, where High and Low levels are treated as separate stations. What about St Pancras? Would visiting on Thameslink count, or would you need to use EMT services from the terminal platforms too?

Same rails rules are sometimes confusing on the tube, but i'd imagine it would be permissable to visit Richmond to Gunnersmury, Queens Park to Harrow and Wealdstone and Chorleywood to Amersham on tube services. I believe there are also shared rails in the Tyne and Wear area, but i'm not sure.

What about stations with no regular services like Manchester United FC Halt?


Good luck to anyone attempting this bonkers challenge!
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
If you only needed to do each line once (i.e. in one direction only) and omitted PSULs (Passenger Services over Unusual Lines) then I reckon with a lot of planning you might be able to do the entire thing sub-2 weeks.

Not a chance. It would take a full week just to cover Scotland.
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,492
Location
Yorkshire
If you only needed to do each line once (i.e. in one direction only) and omitted PSULs (Passenger Services over Unusual Lines) then I reckon with a lot of planning you might be able to do the entire thing sub-2 weeks.

Covering all the metals and all the crossovers could take a tad longer ;)
 

trevwilliams

Member
Joined
22 Feb 2012
Messages
54
Location
Ireland
Having looked up a little more info on the tube challenge I think having to visit every station would result in prohibitively long journey times. If i were to decide on doing a similar thing it would be to travel over the entire timetabled routes as published in the National Rail timetable. Wiki states that as of 2010 the network has 9789 miles of track. I'm not certain how much of that carries timetabled passenger services but if one were to calculate a daily mileage of say 400 miles then it looks like taking about 3 weeks - so a fourteen day and a seven day ALR should be ample.
 
Last edited:

NSE

Established Member
Joined
3 Mar 2010
Messages
1,910
He said omitting PSUL's, which if that as the case, I reckon the main bulk could be done in about two weeks
 

David Goddard

Established Member
Joined
8 Aug 2011
Messages
1,514
Location
Ely
Would love to give this a go!
As long as you can be in Manchester on a Friday, Birmingham on a Saturday and Exeter on a Sunday then the rest should be OK.
 

hairyhandedfool

Established Member
Joined
14 Apr 2008
Messages
8,837
What pass-through rule did you use for that?

I didn't set one, it was more about going along the route than visiting the stations, the point really was the length of time it took to do it.

Would love to give this a go!
As long as you can be in Manchester on a Friday, Birmingham on a Saturday and Exeter on a Sunday then the rest should be OK.

and Bristol and Gainsborough/Barnetby on a Saturday. Being in Lancaster for midday would also be useful.
 

ian959

Member
Joined
9 May 2009
Messages
483
Location
Perth, Western Australia
I have actually tried doing the whole network passing though all stations and I missed three or four sections of the whole thing in just under 2 months - 5 trips to the UK in 2010/2011. I was trying to do PSULs too, but I missed quite a few of those. The problems in planning were some of the summer only services and the parliamentary services - Stockport to Stalybridge was always the one that created the problem for me and yes it is one that I missed...
 
Status
Not open for further replies.

Top