the modernization plan included the following steps:
Restoration of 4 tracks and 4 platforms for all stations between Tyseley and Dorridge:
1) Acocks Green: Second Island platform rebuilt, and car park relocated into a multi-story building in spare space alongside the track or underground
2) Olton: Second Island platform rebuilt and connected to current platform via bridge, and canopies added.
3) Solihull: Second Island platform rebuilt and connected to current platform via bridge, and canopies added.
4) Widney Manor: Second Island platform rebuilt, and and connected to current platform via bridge, and canopies added. Car park relocated either in a multi story building nearby, above the station or underground.
5) Dorridge: Despite having 4 tracks, there's only 3 platforms, and a 4th one needs to be constructed, also connected via bridge.
Upgrades to London section:
1) Restore quadruple track between South Ruislip and West Ruislip. This would involve the reconstruction of the down platform at West Ruislip, the reconstruction of the up platform at South Ruislip and the demolition of West Ruislip signal box. This is already proposed
2) Construct a new combined West Hampstead Interchange, bringing together 3 close stations to allow easy access between the London Underground (Jubilee Line), Overground (Mildmay line) and Thameslink.
3) If the West London Orbital (WLO) ever goes ahead, add Overground services to Marylebourne via Old Oak Common
Partial Electrification:
1) Electrify Snow Hill sections down to Stratford-Upon-Avon and Leamington Spa
2) Electrify London section from Marylebourne to Gerrards Cross
3) Partial electrification would allow fully electric trains for local commuter services, especially WMR (730s likely used, but could require platform lengthening. Alternatively order new trains). Chiltern (or GBR replacement) can switch to bi-mode trains (e.g., class 93s and 755s).
4) Full electrification could be discussed in the far future.
I also support the Midland Rail Hub Project in current form. Regarding its plans to have XC services terminate at Moor Street, I think XC should stop at Solihull and/or Dorridge.
what do you think of my idea(s)?
Restoration of 4 tracks and 4 platforms for all stations between Tyseley and Dorridge:
1) Acocks Green: Second Island platform rebuilt, and car park relocated into a multi-story building in spare space alongside the track or underground
2) Olton: Second Island platform rebuilt and connected to current platform via bridge, and canopies added.
3) Solihull: Second Island platform rebuilt and connected to current platform via bridge, and canopies added.
4) Widney Manor: Second Island platform rebuilt, and and connected to current platform via bridge, and canopies added. Car park relocated either in a multi story building nearby, above the station or underground.
5) Dorridge: Despite having 4 tracks, there's only 3 platforms, and a 4th one needs to be constructed, also connected via bridge.
Upgrades to London section:
1) Restore quadruple track between South Ruislip and West Ruislip. This would involve the reconstruction of the down platform at West Ruislip, the reconstruction of the up platform at South Ruislip and the demolition of West Ruislip signal box. This is already proposed
2) Construct a new combined West Hampstead Interchange, bringing together 3 close stations to allow easy access between the London Underground (Jubilee Line), Overground (Mildmay line) and Thameslink.
3) If the West London Orbital (WLO) ever goes ahead, add Overground services to Marylebourne via Old Oak Common
Partial Electrification:
1) Electrify Snow Hill sections down to Stratford-Upon-Avon and Leamington Spa
2) Electrify London section from Marylebourne to Gerrards Cross
3) Partial electrification would allow fully electric trains for local commuter services, especially WMR (730s likely used, but could require platform lengthening. Alternatively order new trains). Chiltern (or GBR replacement) can switch to bi-mode trains (e.g., class 93s and 755s).
4) Full electrification could be discussed in the far future.
I also support the Midland Rail Hub Project in current form. Regarding its plans to have XC services terminate at Moor Street, I think XC should stop at Solihull and/or Dorridge.
what do you think of my idea(s)?