The Swiss railway network is arguably the best in Europe and among the best in the world. Convenience and connectivity are the goals of the network, and much of this made possible by great infrastructure investment and the Taktfahrplan, an integrated timetable on a national scale running to a clockface schedule and is integrated with other forms of public transit. Arrive to a hub station on bus or regional train, board your intercity to another hub station, catch another bus or regional train.
It runs like clockwork most days with SBB boasting up to 94.1% of trains being on time (defined as within 3 minutes of scheduled arrival) and 98.6% connection punctuality. So naturally it's easy to think the UK and many other countries should follow Switzerland as an example, but could a British Taktfahrplan actually be implemented? Well, this is where scale and layout come into play. Switzerland's network is grid-like with multiple hubs and nodes while the UK network is more circle-radial with London as a focal point.
With so many trunk routes I can't see it being easy to implement a national pulse, but I do think it could be possible for the British network to implement regional pulses with some nationwide nodes. Birmingham New Street (WCML, XC), Cambridge (EWR, XC, GEML), Oxford (EWR, GWR), Leeds (TPE, ECML), Reading (GWR, SWML), Manchester Piccadilly (TPE, WCML) and Milton Keynes Central (EWR, WCML) are a few prime examples I can think of with some secondary nodes like Liverpool Lime Street, York and Carlisle.
Some natural disadvantages is that this would take decades to build up and also mean some journeys might either need to speed up which might require investment in infrastructure, or be slowed down so they can work within a pulse of 15, 30, 45 or 60 minutes and so on. HS2 and Northern Powerhouse could've potentially made it easier with proper segregation of express and regional traffic, but that looks to be a pipedream by itself, never mind among a massive timetable shift.
But what do we think? Is a British version of a Taktfahrplan mere fantasy? Or is it a feasible plan that could we could see within fifty years? Let me know your thoughts and ideas below.
It runs like clockwork most days with SBB boasting up to 94.1% of trains being on time (defined as within 3 minutes of scheduled arrival) and 98.6% connection punctuality. So naturally it's easy to think the UK and many other countries should follow Switzerland as an example, but could a British Taktfahrplan actually be implemented? Well, this is where scale and layout come into play. Switzerland's network is grid-like with multiple hubs and nodes while the UK network is more circle-radial with London as a focal point.
With so many trunk routes I can't see it being easy to implement a national pulse, but I do think it could be possible for the British network to implement regional pulses with some nationwide nodes. Birmingham New Street (WCML, XC), Cambridge (EWR, XC, GEML), Oxford (EWR, GWR), Leeds (TPE, ECML), Reading (GWR, SWML), Manchester Piccadilly (TPE, WCML) and Milton Keynes Central (EWR, WCML) are a few prime examples I can think of with some secondary nodes like Liverpool Lime Street, York and Carlisle.
Some natural disadvantages is that this would take decades to build up and also mean some journeys might either need to speed up which might require investment in infrastructure, or be slowed down so they can work within a pulse of 15, 30, 45 or 60 minutes and so on. HS2 and Northern Powerhouse could've potentially made it easier with proper segregation of express and regional traffic, but that looks to be a pipedream by itself, never mind among a massive timetable shift.
But what do we think? Is a British version of a Taktfahrplan mere fantasy? Or is it a feasible plan that could we could see within fifty years? Let me know your thoughts and ideas below.
