I don't think they can build any more 390 vehicles.
Is that due to some reg that a new build would fall foul of?
I don't think they can build any more 390 vehicles.
Is that due to some reg that a new build would fall foul of?
If the price is right....Probably because they are an old design which the manufacturer wouldnt be interested in restarting production of them for such a small order!
If the price is right....
They were delivered as 11-car sets but had the two additional vehicles removed for a time to operate as 9-car sets in service.In reality, there was only an additional 3 sets ordered even though 4 were delivered as one was a replacement for 390033 (written off at Grayrigg) - I believe they were all delivered as 9 car sets and had the additional two coaches retrofitted?
But the price would be the same, or even greater, if the railways ran their own factories.Which would mean the price is much higher than it should have been!
But the price would be the same, or even greater, if the railways ran their own factories.
The difference would be that you would be paying the cost of keeping a production line open on a yearly basis whether trains are being built or not, rather than paying a premium for a production line to be reopened (or for an open line to be retooled for the older model vehicles) if and when it becomes necessary.
In addition to paying for the factory rather than just the products of someone else's factory, there's an economy of scale that applies when someone else is building lots of trains for other people in addition to yours, and giving everyone the benefit of using proven designs.
British Rail was hardly the model of efficiency in this area, thanks to their scattergun approach of ordering over 30 diesel locomotive classes (not including shunters) with only a handful having more than 200 built.
However nowadays mechanical jigs can be universal and the line controlled by computer, so fixed costs per type are not as high as they were, however standards move on, and 390s are no longer compliant as new build for either 125 or 140 MPH units.
When Greyrigg happened, people on here claimed the production line was shut and no replacement would be able to be built.
When the replacement, the extra sets and the 11 car add ons were completed, people on here claimed the production line was shut and no additions would be able to be built.
When the 2012 franchise was announced with baby-pendos, people on here claimed that these would be the last possible builds, and the production line would shut after they were built.
When the 2012 franchise collapsed, people on here claimed the production line was shut and there was no chance of getting the baby-pendos built.
When Alliance announced they were going to buy pendos, people on here claimed the production line was shut, and whatever Alstom had told them, they weren't going to be getting their trains.
Every time this topic comes up, there's someone claiming it would be impossible to get more 390 vehicles built, yet Alstom keeps offering them for sale, and TOCs keep placing potential orders.
Alstom know they are the only people with a ready-to-build 140MPH tilting EMU design that fits inside the UK loading gauge. If they turn round and go "no, we don't want to build that any more, you'll have to fund a new design and place a minimum order quantity", all that will do is open the doors to Bombardier and Siemens to build a competing product.
Therefore any new pendolinos will not be 390s.
That is exactly what people on here were saying when it became clear the Grayrigg pendo had been written off. If what you're saying was 100% true, there would have been no baby-pendo option being talked about during the 2012 fiasco.
Alstom are clearly open to the idea of reopening the class 390 production line (even if that is an updated 390/2) to anyone wishing to actually buy one.
Enter stage right, new Pendo Class 810 ! LOL
From my experience virtually all virgin trains are seriously overcrowded as are the london midland trains.
Yeah, I've had to share coach U with 3 or 4 other passengers on some recent runs all the way down to Euston.
Yeah, I've had to share coach U with 3 or 4 other passengers on some recent runs all the way down to Euston.
On VT the only trains I find to be overcrowded are those leaving Euston between about 1900 and 2030 on Friday evenings, and some going south on Sundays, as well as a few leaving Euston at commuter time with MKC stops. Other than that they seem to either be quiet, or all seats taken but almost no standing.
LM's Trent Valley 4-car services, OTOH, seem overcrowded near enough all the time.
Neil
390054 was definitely delivered as an 11 car set.
I've got photos to prove it whilst on testing at Crewe with "11 car pendolino" branding on the side of each end driving unit!
It was, then after testing, 2 cars were detached and it entered service initially as a 9 car set. It has since had the two extra cars restored.
I have seen suggestions that the London Midland WCML Slow services, minus the ones going to Crossrail, may be merged into the normal InterCity West Coast franchise during the rebuild of Euston to make things less difficult to manage. If this is true, then it's possible that some of the overcrowding will transfer from the London Midland trains and onto Virgin.
I have seen suggestions that the London Midland WCML Slow services, minus the ones going to Crossrail, may be merged into the normal InterCity West Coast franchise during the rebuild of Euston to make things less difficult to manage. If this is true, then it's possible that some of the overcrowding will transfer from the London Midland trains and onto Virgin.
And renumbered to 390154
To be honest, it's bad enough at the moment at Wolverhampton when a 9 carriage Pendolino from Scotland empties onto an already full 4 carriage Voyager in order to achieve a 7 minute quicker arrival at Birmingham.
Can you imagine what it would be like with an 11-car Pendolino?