It's been mentioned on here before that funds raised by the ACLG's contract with Serco for the Caley Sleeper will be used to restore other locos in the custody of the ACLG, including 89001.
In this month's Railways Illustrated, a section of the rumour column (which admittedly does come with a note advising against taking anything as fact) states the following:
What's this referring to? I'd always assumed that if it returned to the main line, it'd either go on hire to East Coast as a spare loco, run some charters or join the 86s and 87 as backup for the Scotrail contract - none of which are particularly surprising or shocking.
In this month's Railways Illustrated, a section of the rumour column (which admittedly does come with a note advising against taking anything as fact) states the following:
And the news that 89001 is being prepared for main line registration will undoubtably cause some to fall off the end of the platform with their knowledge of what it will be doing.
What's this referring to? I'd always assumed that if it returned to the main line, it'd either go on hire to East Coast as a spare loco, run some charters or join the 86s and 87 as backup for the Scotrail contract - none of which are particularly surprising or shocking.