• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

70802 at Paddington

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
The part on top of the pole appears to be a GPS receiver (the kind we use for surveys) and I imagine the part at the bottom is some kind of track scanner, possibly laser based.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,255
It's a 'man portable' track geometry measurement system that can be mounted on the coupling of a loco or unit.

There were photos knocking around maybe 2 or even 3 years ago of it being used (up north somewhere) on a 15x in passenger service.

(Drawing a blank with google at the moment, probably can't find a suitable search term.)
 
Last edited:

Y186520

Member
Joined
18 Aug 2013
Messages
63
Location
EASTLEIGH
I snapped it on Jan 6th on the front of 70810 at Eastleigh, in a what on earth is that moment .



Carl Watson has a picture on his site from Jan 14th in Eastleigh works with it
on 56087. he descibes it as RILA survey equipment.

http://www.carlswatson.com/trains.html


Does anyone know what RILA stands for?
 

Attachments

  • 06-01-2015 1000 EASTLEIGH HOLDING SIDINGS 70810 CLOSE UP.JPG
    06-01-2015 1000 EASTLEIGH HOLDING SIDINGS 70810 CLOSE UP.JPG
    241.8 KB · Views: 102

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
It's entirely possible that "RILA" is a Dutch, not English, acronym.
 

Y186520

Member
Joined
18 Aug 2013
Messages
63
Location
EASTLEIGH
Thanks for those replies. The Dutch seem to use it extensively with different stock from Mat 64's to Statler's.

The raildata website refers to rail alignment and geometry information.

Perhaps its just using RaIL Alighnment to make the acronym.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,624
Location
Hampshire
It's a 'man portable' track geometry measurement system that can be mounted on the coupling of a loco or unit.

There were photos knocking around maybe 2 or even 3 years ago of it being used (up north somewhere) on a 15x in passenger service.

(Drawing a blank with google at the moment, probably can't find a suitable search term.)

Indeed, and it has been used with Colas Rail's 47749 in the Wigan area back in 2013, there is a brief mention of it on here with the same link as posted by you.

http://www.railforums.co.uk./showthread.php?t=87555&highlight=RILA

Has been doing it for a month or so now, and not the first time it's ran into Paddington with a Colas 70 either.
 
Status
Not open for further replies.

Top