• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

5mph approach to North Berwick

Status
Not open for further replies.

urpert

Member
Joined
1 Dec 2015
Messages
1,170
Location
Essendine or between Étaples and Rang-du-Fliers
I’ve travelled on this line a few times now and each time am surprised by the 5mph approach to the station - it’s the only time I’ve seen a speed limit that low on a main line. As I understand it the branch itself isn’t signalled, with only one train between Drem and North Berwick at any time and a fixed distant board some way before the 5mph speed limit sign. Is there a special reason for the unusual approach?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Llama

Established Member
Joined
29 Apr 2014
Messages
1,959
It's definitely 5mph into the platform, for the last five chains before the station. 10mph prior to that.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,301
Location
Glasgow
I’ve travelled on this line a few times now and each time am surprised by the 5mph approach to the station - it’s the only time I’ve seen a speed limit that low on a main line. As I understand it the branch itself isn’t signalled, with only one train between Drem and North Berwick at any time and a fixed distant board some way before the 5mph speed limit sign. Is there a special reason for the unusual approach?

Is the buffer stop TPWS-protected?
 

alxndr

Established Member
Joined
3 Apr 2015
Messages
1,680
Is the buffer stop TPWS-protected?

Wikimedia suggests yes.
North_Berwick_railway_station%2C_East_Lothian%2C_Scotland._Platform_looking_towards_the_%27buffers%27.jpg


Source
 

civ-eng-jim

Member
Joined
16 Jul 2011
Messages
405
Location
UK
Quite a steep gradient downhill right into the station iirc.

1 in 63 according to an old 5-mile diagram I have. But then it's level from the overbridge.

Interestingly Google Street view has the speed board on the east of the bridge (Ware Road just before the platforms) but Network Rail's RouteView has it on the west of the bridge. Has the platform been lengthened requiring the speed board to be moved too?

Are there gauging issues which may necessitate the speed restriction?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,301
Location
Glasgow
1 in 63 according to an old 5-mile diagram I have. But then it's level from the overbridge.

Interestingly Google Street view has the speed board on the east of the bridge (Ware Road just before the platforms) but Network Rail's RouteView has it on the west of the bridge. Has the platform been lengthened requiring the speed board to be moved too?

Are there gauging issues which may necessitate the speed restriction?

I've no idea I'm afraid, the steep gradient and possible lack of TPWS were the only two reasons I could think of.
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
The platform was lengthened a couple of years ago to accommodate 6-coach 385s. Given that they have both regen and disc brakes, and that the limit in the much steeper QS tunnel is much higher, I guess the limit is historical and it's not been worth anyone's time to reassess the limit.
 

Highlandspring

Established Member
Joined
14 Oct 2017
Messages
2,777
The limit predates the introduction of TWPS and was brought about by a quite nasty bufferstop collision. There were attempts made to get it raised to 10mph or even 15mph at the time of the platform extension but it fell victim to political shenanigans between Network Rail and ScotRail. The individual who was the main blocker has now left the rail industry so it’s possible that it may be looked at again.
 

Steamysandy

Member
Joined
29 Jan 2018
Messages
250
Location
Longniddry
Originally the platform was double track and extended past the white van beyond the present buffer stop.
Even then buffer stop collisions were not unknown-coaches ended up on the street on one occasion about a century ago!
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
It will also get caught in the trap that no-one wants to pay for the investigation work to prove that it is now safe enough to raise ... but the drivers will pass the end of the platform at a low speed anyway, so it wouldn't make much difference to journey times.
 

Highlandspring

Established Member
Joined
14 Oct 2017
Messages
2,777
It will also get caught in the trap that no-one wants to pay for the investigation work to prove that it is now safe enough to raise ...
All that was done at the time but it was never signed off... Agree it’s unlikely to be reviewed but it wouldn’t require much.
 

civ-eng-jim

Member
Joined
16 Jul 2011
Messages
405
Location
UK
It's just a spreadsheet to populate.

It won't make a difference to journey times, but it is frustrating when a train crawls into a platform for ages and not knowing when it's about to stop. Now? No, bit more.... OK definitely now....no, bit more.
 
Status
Not open for further replies.

Top