DRS came unstuck yesterday on the WCML with their choice not to use electric traction. The failure between Carlisle and Penrith caused significant delays.

 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

transportphoto

Established Member
Associate Staff
Jobs & Careers
Quizmaster
Joined
21 Jan 2010
Messages
5,555
DRS came unstuck yesterday on the WCML with their choice not to use electric traction.
Can you elaborate how the specific choice to use diesel caused this to happen, and how it would not have happened with an electric locomotive?
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,107
Location
North London or Mildmay line
Can you elaborate how the specific choice to use diesel caused this to happen, and how it would not have happened with an electric locomotive?
It is generally the case that electric locomotives fail less, and also DRS have the 88s which are significantly newer than the diesel 66 which was used on this service.
 

LRV3004

Member
Joined
17 Mar 2015
Messages
621
Utter tripe. Log on to Real Time Trains and check out last night’s 4M48 which had an 88 on it……..same issue as 4M82…….
 

dave59

Member
Joined
28 Jul 2010
Messages
143
Utter tripe? Thanks.
Out of interest do you know what same issue caused both the 4M48 and 4M82 failures?
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,249
Utter tripe? Thanks.
Out of interest do you know what same issue caused both the 4M48 and 4M82 failures?
Assuming the diesel was a 68 the the cause will be trying to put more power through 4 axles that results in trying to apply more TE than the speed (adhesion decreases with speed) and local adhesion conditions at that point in time can support.
Freightliner with 2x90s and applying less power through each axle aren't slipping to a stand.

The problem is too few powered axles.
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,107
Location
North London or Mildmay line
Assuming the diesel was a 68 the the cause will be trying to put more power through 4 axles that results in trying to apply more TE than the speed (adhesion decreases with speed) and local adhesion conditions at that point in time can support.
Freightliner with 2x90s and applying less power through each axle aren't slipping to a stand.

The problem is too few powered axles.
Diesel was actually a 66
 

dave59

Member
Joined
28 Jul 2010
Messages
143
Openrail showed that a cancelled TPX service at Carlisle was due to a "diesel loco failure" hence the original post. I don't know where the "slipped to a stand" info was from but agree that a 66 and certainly 2x90 are much less likely to have adhesion problems than a 68/88.

Carping on about (increased) use of diesels over this route is very tiresome for some but their performance (or lack of) does cause delays even in ideal weather conditions.
 

sjpowermac

Established Member
Joined
26 May 2018
Messages
2,079
20.10.2024
Allocations
4M82 66425
4M48 88006

Most of the delay to 4M48 was due to it being held in Kingmoor Loop, once it became clear the preceding train with 66425 was in trouble.

== Doublepost prevention - post automatically merged: ==

Diesel was actually a 66
Is the correct answer:)
 
Status