• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

4L21 wrong-routed at Chippenham Junction (11/04/2026)

Status
Not open for further replies.

Intercity_225

Member
Joined
13 Jan 2024
Messages
599
Location
March
4L21 Tinsley - Felixstowe failed at Chippenham Junction (near Bury St Edmunds) last night, and has just got back on the move 300+ mins late.

However, the line from Bury - Ipswich is now shut for engineering works. So where it's going to go, I'm unsure. Can anyone help?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yorkshirerail

Member
Joined
8 Mar 2026
Messages
460
Location
Leeds
4L21 Tinsley - Felixstowe failed at Chippenham Junction (near Bury St Edmunds) last night, and has just got back on the move 300+ mins late. However, the line from Bury - Ipswich is now shut for engineering works. So where it's going to go, I'm unsure. Can anyone help?
Looks like it is currently heading back to Ely
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,560
Location
Somewhere
It hasn’t failed (I know that’s what the online systems might says). It was sent on a route that was blocked by engineering work and required to be run round and wrong direction moves.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,874
Location
East Anglia
Journey check just says cancellations until further notice. Suppose there’s no easy way to rescue it.

== Doublepost prevention - post automatically merged: ==

It hasn’t failed (I know that’s what the online systems might says). It was sent on a route that was blocked by engineering work and required to be run round and wrong direction moves.
Oh dear. That’s a bit of an own goal.
 

Intercity_225

Member
Joined
13 Jan 2024
Messages
599
Location
March
It hasn’t failed (I know that’s what the online systems might says). It was sent on a route that was blocked by engineering work and required to be run round and wrong direction moves.
That's very misleading from NR & GA then, which both state 'broken down freight train'. Considering how bad GA was at managing the broken down train at Broxbourne last night, the customer service has been very lacking of recent.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,874
Location
East Anglia
That's very misleading from NR & GA then, which both state 'broken down freight train'. Considering how bad GA was at managing the broken down train at Broxbourne last night, the customer service has been very lacking of recent.
Operational incident might have been better but then you’ll get a multitude of questions as to what it actually is. Easier to just state it as broken down as effectively blocking the line.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,874
Location
East Anglia
2L71 is being let out of Ely now 75 minutes down.
Not good for any Ipswich Town fans from Bury who were hoping to travel via Ely for the local Derby. Even one of the Cambridge-Norwich relief trains has been cancelled too. The others and EMR are going to be dreadfully crowded.
 
Status
Not open for further replies.

Top