• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

4E25 - Bow - Heck

Status
Not open for further replies.

gbbub321

On Moderation
Joined
28 Oct 2020
Messages
19
Location
Wakefield
Apologies I thought you meant the the Biggleswade/Bow side of the work.

Yes the Europort link covers Heck, However their work is usually "tagged" on with something else. I've never had Knottingley G/Staff. Regarding loading, again I cannot see that DB G/staff would load the wagons.
Now whether there's plans afoot to operate Plasmors Pilot, I don't know but again I cannot see it and the grapevine is not buzzing
I’m hearing that gb are in talks to run the services into and out of Europe at Wakefield and Trafford park ,

== Doublepost prevention - post automatically merged: ==

Apologies I thought you meant the the Biggleswade/Bow side of the work.

Yes the Europort link covers Heck, However their work is usually "tagged" on with something else. I've never had Knottingley G/Staff. Regarding loading, again I cannot see that DB G/staff would load the wagons.
Now whether there's plans afoot to operate Plasmors Pilot, I don't know but again I cannot see it and the grapevine is not buzzing
Is judd still about
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
16 Feb 2014
Messages
299
I’m hearing that gb are in talks to run the services into and out of Europe at Wakefield and Trafford park ,

== Doublepost prevention - post automatically merged: ==




Is judd still about
That could prove interesting !!! I must admit i'm stuck on RHTT at the moment so out of the loop with the intermodals


Oh yes !!! Lady Judd is still in the Peterborough fold
 
Status
Not open for further replies.

Top