so the 47/7 were already knackered before they got to Waterloo-Exeter?
explains a lot............
Definitely, running frequently at 5mph over design speed from May 1984 didn't help either despite the much more frequent exams, but the staff notice for the introduction of 100mph operations noted that drivers were expected to accelerate to and maintain 100mph as much as possible as the accelerated schedule required it.
The adjustments to the field diverts for 100mph running also made them more sluggish at lower speeds.
In the Railway Magazine April 1990, there is an article on the end of push-pull, there are two logs with 47/7s on the E&G, one each way.
In the first log, the train fails to exceed 87mph (recorded at Lenzie), the driver mentions that you would normally expect to be doing 100 by then and that the loco deemed tired.
The other way, 94mph was the highest recorded, behind a different loco.