• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

458/0 Drag

Status
Not open for further replies.

ChampsRacing

Member
Joined
10 Jun 2007
Messages
269
Location
London
Just passed 458015 & 023 Inbetween two barrier coaches and a colas 47 at Wimbledon park presumably for Wabtec.

Been informed its a test drag to Eastleigh.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,161
Hasn't work begun already on the 460s? Better than leaving them to rot I suppose.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,246
Perhaps this, http://www.realtimetrains.co.uk/train/R43299/2013/06/01/advanced

Any idea what for, bit early for conversion isn't it?

It has always apparently been the plan that once a couple of completed 458/5s were available for service the first pair of 458s could go for conversion themselves. May 2013 was the original date IIRC, so getting the translators ready and tested is needed about now.

Eastleigh is relevant in that the translators were modified there, but the work on the 458s will take them up to Wabtec.
 

455driver

Veteran Member
Joined
10 May 2010
Messages
11,329
Hasn't work begun already on the 460s? Better than leaving them to rot I suppose.

Work has begun on the 460s but not the 458s yet, as for "better than leaving them to rot I suppose", the 458s are still in everyday use on Readings, Guildfords and Ascots! :roll:
In fact a 458 had the pleasure of playing skittles at Putney (or Wandsworth Road) last night (Saturday).

The 47/458 ensemble was seen crawling through Woking on the return working at about midnight.
 
Last edited:

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,161
The 458s haven't been rotting, at least not through a lack of use :D All but 4 of the 460 carriages which are not allocated to lengthening existing 458/0 units are being formed into 6 additional 5-car units. Makes sense to get the ex-GX into service first and working on the current units when these are settled.
 

cj_1985

Member
Joined
6 Mar 2010
Messages
845
Location
Lanarkshire
Perhaps this, http://www.realtimetrains.co.uk/train/R43299/2013/06/01/advanced

Any idea what for, bit early for conversion isn't it?

im going to ask a stupid question here, but based on the listings via that link... can anyone confirm that the contract to move the 458s (both 458/0s TO the works, and 458/5s FROM the works) has been awarded to Colas Rail... rather than to GBRf who has hired in Colas traction for the service (as has been happening frequently of late - albeit mostly for infrastructure duties) due to the final destination/signing off point, or was that just a coincidence.


it doesn't sound like a stupid question in my head... but that doesn't mean it isn't stupid... so if so, I apologise
 
Status
Not open for further replies.

Top