Dunderhead
Member
I wouldn't insist on a DMU, but I don't like the idea of "dropping" to a 456. I like your 460 idea though, even if it isn't possible.
I imagine the 456s will be lovely once they've had an SWT refurb so I wouldn't worry too much!
I wouldn't insist on a DMU, but I don't like the idea of "dropping" to a 456. I like your 460 idea though, even if it isn't possible.
So you'd merrily waste a much needed DMU on it all day then for the sake of image?
I had actually thought in the past why they don't just use two of the redundant end coaches from the 460 breakup joined together and use that on the Lymington branch all day.
[...]All the details of which stations and which platforms will be extended for ten cars is in the CP4 enhancement plans, as recently updated.
As well as the passenger doors (and windows?) being scavenged for the other units, as far as I understand the redundant cars will have had their traction equipment removed as well? So you'd have a two car unit with roller doors, no windows/unglazed windows and potentially no way of moving. Other than that, no problem!![]()
::awaits the first "it'd still be better than a Pacer" comment::
Which can be found, where? Link?
Will they be added to the ends? Or sandwiched in between two 4-car sets so they never need to be driven?
No-one yet seems to know (or at least, no-one has given an official line). SWT inner suburban services run with Guards who would usally use the 455's connector (it is shut to passengers unlike 317s)
Is this really enough to run everything via Sydenham and Balham as 10 car from December 2013?
It depends how the original proposal is interpreted. This was debated elsewhere regarding SWT a couple of years back, when people were racking their brains trying to work out how to extend all the 455 operated services to ten car - clearly this would require about 91 carriage equivalents, to go with the existing 91 four car units.
But then an SWT driver chipped in with the point that it didn't need to be throughout the peak, just the high peak, and careful diagramming would ensure that most arrivals between 8 and 9 could be 10 car.
Now in the SN case, which of the following do they really mean?
a. every train on all those routes will be ten car,
b. some of the trains on all routes,
c. all of the trains on some of the routes
d. some of the trains on some of the routes...![]()
Good point, take it thy've never actually shown anything about actual number of trains lengthen?
Sorry, here it is:
http://www.networkrail.co.uk/WorkArea/DownloadAsset.aspx?id=30064781108
Package 7 on pages 108 - 111. The last section gives the start dates for each station involved, some are this month.
I'd like to know how Guildford P1&2 and the bay at Weybridge are going to be done. Guildford will involve moving quite a bit of pointwork I think - I'd like to see plans for both those.
Good on Dft and SWT! Southern won't need them after LO take over the SLL and they get their new 377/6s. SWT will be using alot of old Southern stock (456s, 460s) on their commuter network in a few years. I assume when they say 48 456's they mean either 24 456's or 48 carriages.
Adam![]()
Yes, the 456s most certainly went to Fratton, I have a picture of around 16 of them taken from the station footbridge sometime in summer 1991.
Care to share your picture?