northwichcat
Veteran Member
Huh? There would have to be if this Electric Spine OHLE plan proceeds. They provide the majority of the service through Basingstoke to Southampton.
Unless you think Waterloo to Weymouth should become solely 450 operated?
What I've heard is Siemens quoted an estimate for making the 450s capable of running on AC overheads (already a tried and tested method) and that's what DfT used in the business case for AC OHE to Southampton.
Remember the OHE to Southampton is an experiment to see how well replacing 3rd rail with OHEs works so I would be surprised if a lot of SWT's Desiros get pantographs fitted unless more of the same type of work is confirmed for CP6.
Last edited by a moderator:
