[Crayon alert!] Could space be found for 400m long platforms at Glasgow Central?
When HS2 phase 1 starts, the fastest route from London to Edinburgh will be via HS2 phase 1 and Carlisle. So I'm expecting England-Scotland passenger traffic via Carlisle to grow strongly over the next twenty years, especially if they build phase 2a to Crewe.
But the WCML is limited by the constraints from running mixed traffic on a two-track railway over Shap and Beattock. One way to maximise capacity, without the expense of four-tracking parts of the route, would be to optimise the timetable by flighting pairs of 400m trains one after the other, one going non-stop to Edinburgh and one to Glasgow.
Edinburgh Waverley already has two platforms that can handle 400m trains. (Discussed here: https://www.railforums.co.uk/threads/400m-platforms-at-edinburgh-waverley.269975/ ). So this thread is to consider how it would be possible to accommodate 400m HS2 trains at Glasgow.
Central is a very awkward site with listed buildings in Union Street and Jamaica Street restricting growth on the East side of the station. But there is the length available to accommodate 400m trains by extending platforms over the river. From the buffer stops to Oxford Street across the river is 635m, as shown in the Google map extract below (where East is to the top).

Platform 11 at GLC is already 353m long, and there is space to extend P11 and P12 to 420m simply by building in the space between Line F and Line 6 that is already there on the bridge across the river. But this length would be completely unusable by HS2 trains due to the impossibly narrow neck between platforms 11 and 12 going over Clyde St / Broomielaw Road.
So how could they build 400m platforms?
Space where the station could expand are outlined in red here.

My first thoughts are sketched in the diagram below:

This would of course be a major undertaking and may be impossible because of the way that the train shed is supported. I don't know Central station at all and can't find many images of the interior of the station to show the layout of the roof and the separate sections of the building, so this may all be wildly impractical.
Alternatively, they could just keep to the plan and split HS2 trains at Carlisle.
Anyway, those are my thoughts. Any comments or (constructive) criticism welcome!
When HS2 phase 1 starts, the fastest route from London to Edinburgh will be via HS2 phase 1 and Carlisle. So I'm expecting England-Scotland passenger traffic via Carlisle to grow strongly over the next twenty years, especially if they build phase 2a to Crewe.
But the WCML is limited by the constraints from running mixed traffic on a two-track railway over Shap and Beattock. One way to maximise capacity, without the expense of four-tracking parts of the route, would be to optimise the timetable by flighting pairs of 400m trains one after the other, one going non-stop to Edinburgh and one to Glasgow.
Edinburgh Waverley already has two platforms that can handle 400m trains. (Discussed here: https://www.railforums.co.uk/threads/400m-platforms-at-edinburgh-waverley.269975/ ). So this thread is to consider how it would be possible to accommodate 400m HS2 trains at Glasgow.
Central is a very awkward site with listed buildings in Union Street and Jamaica Street restricting growth on the East side of the station. But there is the length available to accommodate 400m trains by extending platforms over the river. From the buffer stops to Oxford Street across the river is 635m, as shown in the Google map extract below (where East is to the top).

Platform 11 at GLC is already 353m long, and there is space to extend P11 and P12 to 420m simply by building in the space between Line F and Line 6 that is already there on the bridge across the river. But this length would be completely unusable by HS2 trains due to the impossibly narrow neck between platforms 11 and 12 going over Clyde St / Broomielaw Road.
So how could they build 400m platforms?
Space where the station could expand are outlined in red here.

My first thoughts are sketched in the diagram below:
- Double the width of the bridge across the river. Sufficient to extend one or two island platforms over the water and with two new tracks to carry WCML slows. Demolish the unlisted Leonardo Hotel in Jamaica Street, but not the Category A listed buildings at No36, or the Category B at No42-44.
- Keep P1 - P4 where they are now, but all a similar length, connected across the river to the WCML No1 and No2 sidings (shown in Green). If traffic projections warrant, continue six WCML tracks to Eglinton Street Junction, where the Cathcart Circle lines diverge.
- Remove tracks 6 and 7, and create a new 420m island between P5 and P8 (dark blue), which extends across a widened river bridge.
- Remove tracks 10 and 11, and create a new 420m island between P9 and P12, also extending across the river.
- Keep platforms P13, P14, P15 as they are now (orange), to serve Cathcart Circle and Ayr Line trains.
- If required, build up to three new platforms P16-18 between P15 and Oswald Street, to the West of the station, perhaps with a replacement car park above (navy blue).

This would of course be a major undertaking and may be impossible because of the way that the train shed is supported. I don't know Central station at all and can't find many images of the interior of the station to show the layout of the roof and the separate sections of the building, so this may all be wildly impractical.
Alternatively, they could just keep to the plan and split HS2 trains at Carlisle.
Anyway, those are my thoughts. Any comments or (constructive) criticism welcome!
Last edited: