Would it be possible to 4-track at Welwyn? How could it be done?
Sure it's possible; we can do anything with enough time and resources. Should we do it? Probably not, or at least not until post-HS2 ECML traffic levels are known.
It came as a surprise to me, especially as the EC "ML" is only 2 or 3 tracks form there to Peterborough.
The ECML is 4-track from Woolmer Green to Huntingdon North, isn't it?
Bald Rick is adamant that the ECML is absolutely full south of Welwyn (as you seem to be saying too), so there's no point increasing capacity for anything from further north. Maybe some of the outer suburban semi-fasts will be siphoned off down another Crossrail to allow more long-distance trains access to London. Although we really do have to stop feeding London-land's habit of hoovering up the lion's share of transport investment....Then growth at Cambridge could see a case for more frequent very fast London-Cambridge services. So it looks to me like a very safe bet that post HS2, traffic levels around the Welwyn viaduct will be at least as great as they are today - and that's before you consider the possibilities for frequency improvements on the local services. I'd conclude that 4-tracking would definitely be of considerable benefit for many decades into the future. (Although you still have the problem of the huge cost).
Not quite the same as quadruple all the way to Doncaster is it?The ECML is 4-track from Woolmer Green to Huntingdon North, isn't it?
Could you rebuild Welwyn North Station by moving it southwards enough to build two islands, allowing stopping trains to keep the fast lines clear? Then make a multi storey car park to compensate for the loss of parking.
A satellite view suggests there could just about be enough land and distance to have two extra tracks.
It might be a cheaper way to get a little more capacity without new viaducts or tunnels.
I think it would be quicker to four track the whole thing than attempt to close Welwyn North. The appeals and protests would probably make it cheaper to four track!
But perhaps if you keep running the service down to the station (and Knebworth) everyone will start using Stevenage or WGC, and then you'll be able to justify reducing the service frequency....
Whereabouts would they start at the south end?Another earlier thread (https://www.railforums.co.uk/thread...sion-to-building-new-alignments.169915/page-2 - not the one linked above) explained that there is no capacity for trains further south so there is no point increasing the number of lines at Welwyn. It came as a surprise to me, especially as the EC "ML" is only 2 or 3 tracks form there to Peterborough.
If it was to be done I would go for a pair of tunnels coming out north somewhere like Woolmer Green.
How about branching off around Stanborough Lakes and running two new lines alongside the A1(M) up towards Stevenage. No need to build an expensive viaduct or tunnels, and maybe even being able to open a new station for Old Welwyn at the same time! Obviously land would need to be purchased, but following the path of a road must be a little easier?
(This is of course posted without having any serious research).
I don't want to add yet more pressure for investment in the SE, but I'm sure it would be quite do-able (if it was worth it in terms of being able to handle the extra trains it would be sending into London..)Whereabouts would they start at the south end?
The gradients each way would be quite severe - so severe that IMHO the cheapest thing to do would be to build a new viaduct to the west and then add another pair of tunnels parallel to the existing ones.
Grade 2* listed. Most of the gain could be achieved by extra tunnel bores to the North, so that trains calling at the North station wouldn't be blocking the fast lines.
How about branching off around Stanborough Lakes and running two new lines alongside the A1(M) up towards Stevenage. No need to build an expensive viaduct or tunnels, and maybe even being able to open a new station for Old Welwyn at the same time! Obviously land would need to be purchased, but following the path of a road must be a little easier?
(This is of course posted without having any serious research).
Surely you build it modern, with slim pillars in line with the old pillars?
I am not having this untouchable listed nonesense - presumably if such delicate opinions existed back then the original would never have got built! The juxtaposition of Victorian and modern would add to the scene....
Although waiting in principle sounds sensible, HS2 is unlikely to impact anything on the ECML until phase 2b is complete, which is scheduled for 2033. Given usual delays with infrastructure projects, it's probably not unreasonable to suppose it might well actually be 20 years away. Also, it seems implausible to me that HS2 would cause much reduction in service levels: Currently there are 5tph LNER services: Two to Leeds, two to Newcastle/Edinburgh/etc. and one all stops to Newark (sometimes extended to York). Plus the irregular Grand Central trains. Post HS2, the intermediate ECML stops will still need connections to the North, so we can immediately surmise that there will still be 1tph each to Leeds and York/Newcastle (With perhaps both trains now stopping everywhere between Peterborough and Doncaster). Add to that a whole range of destinations around Lincolnshire that aren't currently served because the paths are taken up by Leeds/Newcastle trains: So I could well imagine 1tph to Grimsby via Lincoln, 1tph to Grimsby via Scunthorpe and 1tph to Hull. With those services, we're already at roughly current traffic levels. Then growth at Cambridge could see a case for more frequent very fast London-Cambridge services. So it looks to me like a very safe bet that post HS2, traffic levels around the Welwyn viaduct will be at least as great as they are today - and that's before you consider the possibilities for frequency improvements on the local services. I'd conclude that 4-tracking would definitely be of considerable benefit for many decades into the future. (Although you still have the problem of the huge cost).
So to clarify, what is the main objection to 4-tracking around Welwyn North? Is it mainly because the cost of building another viaduct and tunnels for the extra tracks is considered too great, or is it mainly because of heritage-related concerns about building next to the current viaduct?
Here's an idea for partial widening, with four tracks through Welwyn North station itself but only one additional new track north and south thereof through new single bore tunnels and over a new viaduct respectively. This concept removes the platforms from the fast lines and allows a stopping arrival at the same time as a fast is passing in the same direction. It also allows a Welwyn North stopper to depart on yellow very close behind a fast that has just passed the station.
http://www.townend.me/files/welwynviaduct.pdf