4 track Coventry corridor

Status
Not open for further replies.

PAS48

New Member
Joined
26 Apr 2025
Messages
3
Location
Coventry
Is the new HS2 bridge at Berkswell wide enough to accommodate 4 tracks on the WCML (if ever built)?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,257
I think it should be, HS2’s PR when the box was completed describe it as 20m wide and 91m long.
 

465fan

On Moderation
Joined
26 Jul 2009
Messages
503
Location
Bexley
Driving under it, it doesn't look it. Neither does the Beechwood Tunnel, to be fair...
 

P Binnersley

Member
Joined
30 Dec 2018
Messages
532
According to the OPC book "An Historical Survey of Selected LMS Stations - Vol 1", the LMS were considering quadrupling the Coventry-Birmingham line in the late 1930's. This never happened, but the 1930's Coventry bypass (A45) bridge near Canley and the one built near the airport for the A45 eastbound carriageway seem to have made provision for the extra tracks.
 