Siemens Staines
Established Member
- Joined
- 30 Jul 2015
- Messages
- 1,484
I thought that it was my maths that was dodgy 
I think in answer to JonathanH original maths question, the limited 3tph that does exist SX today is achieved by using the Basinsgtoke(peaks) and Bourne End(peaks) units for a North Downs trip in the middle of the day (1136 & 1336). In the peaks the 0734 and 1736 turn round at Guildford/Shalford so are only 3tph between Reading and Guildford. I presume when the full 3tph 769 service starts, the SX service will look similar to the current SO service?
I think in answer to JonathanH original maths question, the limited 3tph that does exist SX today is achieved by using the Basinsgtoke(peaks) and Bourne End(peaks) units for a North Downs trip in the middle of the day (1136 & 1336). In the peaks the 0734 and 1736 turn round at Guildford/Shalford so are only 3tph between Reading and Guildford. I presume when the full 3tph 769 service starts, the SX service will look similar to the current SO service?
— and with the windows closed, the noisy diesel in the latter makes it a lot less pleasant than a 319 (with the windows closed!) to my sensibilities. Doors rattling when passing things is definitely more of a problem with the 319s (etc.), it would certainly have been nice if instead of 769s they'd made 815s (since the arithmetic seems to be “add 450”!