Regarding the Redhill to Gatwick leg of this service, isn’t there a current requirement to reduce services and turnrounds at Gatwick during the rebuild anyway? Will that not clash with attempts to run more GWR trains there?
I had previously read on a post on here that it wouldn't do.
The reason for the less trains running at the moment was explained here:
It’s an emergency timetable on the Bedwyn route related to the small pandemic we have going on out there.
It see Reading to Newbury shuttles and Paddington to Bedwyns merged into a Reading to Bedwyn shuttle, as the service doesn’t reach London where the 80x are based using Reading based turbos is more logical.
First class available on 3-car 165s and at one end of a 166 when operating LTV services. Thanks.
www.railforums.co.uk
The shuttles are still running during the day but not in the peaks. I would have kind of hoped with the change in the government messaging on travel they might have been able to run more trains and thus free up stock to run to Gatwick Airport. There is one train that waits at Redhill, which could run to Gatwick Airport at least, as part of the emergency timetable.
At this rate they might put on more trains to Gatwick Airport just as the country locks down again, if that were to happen. This is getting too far away from the original thread topic though, so I'll leave it there.
Of course if a further lockdown happened prior to the next timetable change, could we see the reduced timetable continuing but with the additional planned fast trains running, thus meaning still only trains runs to Gatwick Airport on a Sunday evening.