So - does my idea of a physical inverted ramp fixed to the underside of bridges to 'catch' and guide downwards raised pantographs under the bridge (rather than the bridge simply hitting and destroying it) have any merit? I would have thought it would be a cheap and fool-proof (through being a fixed physical rather than systems item) means of saving at least significant damage, to the extent that trains could still continue in service after an encounter.
It would need to be a long ramp - ie long enough so that at linespeed a pan would be forced down at a rate it can cope with. Likely to be at least 50 metres long.
And then you'd need another ramp at the next bridge, and then the next, and the next...
Surely better just to have a system on the train that drops the pan when DC power is selected.