ChrisCooper
Established Member
Can anyone remember what the reason was for some of the 375s being fully equipped for dual voltage operation? The two things I seem to recall was either in relation to running domestic services on HS1 (they were ordered well before it was decided to go for the 395s), or to do with the East London Line extension and the possibility of through running onto the 25kV network (again it was well before London Overground came about). The other one I've not heard but I suppose would be feasable would be to do with running onto the 25kV network via the Thameslink tunnels.
The first two would seem odd though if trains were being delivered based on routes that were not even open yet, especially as trains could easily be converted or more built in the future. Pre-LO, was the ELL to come under the South Eastern franchise anyway? The ELL's southern extensions are all into South Central franchise terratory. Perhaps there were plans to extend beyond New Cross too. I know Electrostars were talked about for the HS1 domestic services, but I'm sure if they had been selected then new ones would have been ordered, they wouldn't have used the almost 10 year old ones SET already had. Running via Thameslink would have suggested open access, so did Connex have plans for open access services from Kent to the MML or ECML (remember it was originally Thameslink 2000, so should have happened well before it is going to)?
Also, have they ever actually run on 25kV? I presume they have at Derby as they have a short bit wired up for testing, but what about on the network? I presume they would be able to without significant testing as the safety case for operation on 25kV is already there for the Electrostar.
The first two would seem odd though if trains were being delivered based on routes that were not even open yet, especially as trains could easily be converted or more built in the future. Pre-LO, was the ELL to come under the South Eastern franchise anyway? The ELL's southern extensions are all into South Central franchise terratory. Perhaps there were plans to extend beyond New Cross too. I know Electrostars were talked about for the HS1 domestic services, but I'm sure if they had been selected then new ones would have been ordered, they wouldn't have used the almost 10 year old ones SET already had. Running via Thameslink would have suggested open access, so did Connex have plans for open access services from Kent to the MML or ECML (remember it was originally Thameslink 2000, so should have happened well before it is going to)?
Also, have they ever actually run on 25kV? I presume they have at Derby as they have a short bit wired up for testing, but what about on the network? I presume they would be able to without significant testing as the safety case for operation on 25kV is already there for the Electrostar.
