EM2
Established Member
Just a very quick question.
Are there any 319s and/or 313s off-lease, or are they all in operation?
Are there any 319s and/or 313s off-lease, or are they all in operation?
Last edited:
Ah yes, forgot about them.And Ex-SE's 508s?
And aren't the 460s going to South West Trains to provide extra carriages anyway?
So, moving on slightly, is there any reason why FCC couldn't ask to take the 317s for the GN?
The 317/7s especially need a new interior before going to Northern; that's rather what the one that isn't available is away for.
(though as an alternative, I'd look to putting an interior similar to the FCC ones in, send them to FCC to displace 321s, which lose the 1st, to join the existing 321/322 fleet- gives Northern a more uniform fleet)
I was also of the impression 317722 was being given new electrical gubbins to test.
Same goes for the 317s; given the delays in the new Thameslink stock, surely there will be no 319s available for the Manchester-Wigan-Liverpool electrification projects, so why not get ahead of the game and send the 317s to Northern to start crew training and work alongside the 323s until there is a need for EMUs there? I'm fairly sure there are still a few under the wires services worked by DMUs, such as the odd Hazel Grove turn, which could free up a Pacer or two, until 2013/14 when the 8 (or 9) 317s would be enough to cover the Manchester Airport-Liverpool-Warrington/Wigan services via Chat Moss.
Would it not be an idea to send the 317's to Manchester to suppliment the 323's allowing those dmu's working under the wires to add capacity elsewhere in the area?
....Whilst we are on this subject, is Allerton depot wired anyone?
Apart from anything else, the 317/7s have a very low density seating layout- that's the only reason that they in particular were withdrawn when GA decided it could work with less units.
Certainly no 319s spare; after all the Thameslink operation has a long term lease of 377s because the 319 fleet isn't big enough
I find it hard to believe that there is not a case for electrifying Uckfield, with services being provided by 377s. These could be made available from Southern taking on the stored 508s and using them on Sussex services alongside the similar 313s or any of the inner London 'metro' services, for example. This would allow a large portion of the 171s to be moved away elsewhere in any number of Pacer replacement/capacity building cascade moves.
.... and cannot work in multiple with 456s and 455s since they use 'old-school' Dellner couplings (Dellner couplings fitted to 456s and 455s use solid-state electronics).
Aside from the depot building (which doesn't look much longer than a 156!) and maybe a line or two (shunt neck?) at the Liverpool end, yes, it is wired throughout.
If the Uckfield branch is ever electrified I imagine there will be enough 377s released by Thameslink to cover any diagrams. It would be nice to see the stored 508s back in service but I doubt Southern would want them since they're apparently suffering very badly from corrosion, and cannot work in multiple with 456s and 455s since they use 'old-school' Dellner couplings (Dellner couplings fitted to 456s and 455s use solid-state electronics).