Broadside
Member
Hi all, first post!
There was a "Tweet the manager" session with NXEA's Train Planning/Peformance managers earlier this evening. One question I raised concerned the use of 317/7 stock on peak service on the GEML (specifically the 0629 IPS - LST) and the overcrowding caused by the 2+2 seating (all other services apart from the MK3s are 3+2). In addition these sets appear to have far too much first class accomodation carrying nothing but air - I beleive these trains were previously used on Stansted Express service where it would have made more sense.
The response I got was that "there will be some changes made in Feb (to class 321's) so this should balance out the 1st/standard class capacity" to which I asked if this meant the service would be replaced with a 321. The answer "in a word yes - changes on Feb 5th".
So, where are these extra 321s coming from? I thought NXEA (and going forward Abellio) had only surplus 317s since the arrival of the 379s on WA?
Cheers
There was a "Tweet the manager" session with NXEA's Train Planning/Peformance managers earlier this evening. One question I raised concerned the use of 317/7 stock on peak service on the GEML (specifically the 0629 IPS - LST) and the overcrowding caused by the 2+2 seating (all other services apart from the MK3s are 3+2). In addition these sets appear to have far too much first class accomodation carrying nothing but air - I beleive these trains were previously used on Stansted Express service where it would have made more sense.
The response I got was that "there will be some changes made in Feb (to class 321's) so this should balance out the 1st/standard class capacity" to which I asked if this meant the service would be replaced with a 321. The answer "in a word yes - changes on Feb 5th".
So, where are these extra 321s coming from? I thought NXEA (and going forward Abellio) had only surplus 317s since the arrival of the 379s on WA?
Cheers