Anything ordered as part of the IEP procurement is basically untouchable. The 800s and 801s operated by LNER and GWR have very strict contracts governing their use for 27 years (or however long is left of that). Any changes to this will involve bunging Agility a fortune (changing the GWR 801s to 800/3s did, for example).
The solution to that is to have the lawyers scan every word of that contract and find something where it’s been breached to give cause for early termination. Given that the 80xs haven’t exactly been problem free and still have availability issues, from a layman’s perspective one would expect this to be doable.

The gross incompetence of this is still hurting the railway thirty years later. Then it was repeated with the Class 185.
It wasn’t repeated with the 185s, those replaced 158s which offered less capacity.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
3-car 158s have more seats (considerably more if I recall) than 3-car 185s. The TPE Liverpools were near enough exclusively 3-car 158s.
True but TPE had quite a number of 2-car 158s too. Overall, capacity was at worst matched with the 158s. It wasn’t a decrease.
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,573
Location
Macclesfield
Well how many seats per hour did they provide before and after?
Looking at the Birmingham - Newcastle corridor as the example I have timetables for, seats per hour changed from around 48 first, 390 standard pre-Operation Princess to about 52 first, 386 standard post-Operation Princess. Overall, no increase, but no decrease either, and the waters are muddied by the lengths of specific trains each hour. Other corridors would have been similar.
True but TPE had quite a number of 2-car 158s too. Overall, capacity was at worst matched with the 158s. It wasn’t a decrease.
Prior to the 185s being introduced, Transpennine were operating 23x3-car (17 original and 6 hybrids) and 23x2-car class 158s. Assuming a one for one replacement by 185s, which isn't strictly accurate as there were some 4-car 158 diagrams operating on North Transpennine at that point, then that is in fact 7,774 fixed seats provided in both cases; but the 169 fixed seats of a single 185 is a fair step down from the 204 seats of a 3-car TPE class 158, or the 268 seats of a 4-car class 158 formation on any given train.
 
Last edited:

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,924
Looking at the Birmingham - Newcastle corridor as the example I have timetables for, seats per hour changed from around 48 first, 390 standard pre-Operation Princess to about 52 first, 386 standard post-Operation Princess. Overall, no increase, but no decrease either, and the waters are muddied by the lengths of specific trains each hour. Other corridors would have been similar.

Prior to the 185s being introduced, Transpennine were operating 23x3-car (17 original and 6 hybrids) and 23x2-car class 158s. Assuming a one for one replacement by 185s, which isn't strictly accurate as there were some 4-car 158 diagrams operating on North Transpennine at that point, then that is in fact 7,774 fixed seats provided in both cases; but the 169 fixed seats of a single 185 is a fair step down from the 204 seats of a 3-car TPE class 158, or the 268 seats of a 4-car class 158 formation on any given train.
That's always been the interesting comparison between for example the EMR services on the south route and the TPE ones - the TPE 6 cars are nicer trains but heavy on first class and the best people movers are undoubtedly now the EMR 6 car 170s featuring around 370 - 380 seats on the services they operate - and on a Sunday in particular even they can be full and standing.

185s are hugely inefficient trains in general but I suppose they were built to do a job.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,693
Location
"Marston Vale mafia"
185s are hugely inefficient trains in general but I suppose they were built to do a job.

I'd say built too short. A 5-car formation with the same amount of first class would have worked fairly well.

(It does seem that 5x24ish is a fairly sweet spot for a lot of regional express type services that don't go near London - but not XC!)
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,376
Location
belfast
I'd say built too short. A 5-car formation with the same amount of first class would have worked fairly well.

(It does seem that 5x24ish is a fairly sweet spot for a lot of regional express type services that don't go near London - but not XC!)
If I remember correctly, they were intended to be both longer and more numerous, but then the SRA got involved...
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,693
Location
"Marston Vale mafia"
If I remember correctly, they were intended to be both longer and more numerous, but then the SRA got involved...

There was certainly a plan to extend them, yes. But from day one they were really too short. Aside from commuter times TPE didn't have an overcrowding problem before their introduction, but as soon as they came in it got really bad, and wasn't resolved until the coming of the 802s.
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,621
Location
Isle of Man
It wasn’t repeated with the 185s, those replaced 158s which offered less capacity.
It was a bit of both. The 185s had 25 or so more seats than a 2-car 158- which is pretty poor when you think they were 3-car trains- but had about 50 or so fewer seats than a 3-car 158.

They needed to be 4-car, but then the SRA got involved...
TPE 6 cars are nicer trains but heavy on first class
The frustrating thing is that they're not even particularly heavy on first class- there's only 15 first class seats per 185.
But from day one they were really too short. Aside from commuter times TPE didn't have an overcrowding problem before their introduction
TPE did have an overcrowding problem, especially on Sundays. Which is why the size of the 185s was such a bizarre decision by First and the SRA.

Personally, I'd have allowed TPE to order more 802s at the time of the first order and I'd have cascaded the 185s to Northern instead of ordering so many 195s. The 185s really were perfect for Barrow and Windermere.
 

Clansman

Established Member
Joined
4 Jan 2016
Messages
2,654
Location
Scotland
The frustrating thing is that they're not even particularly heavy on first class- there's only 15 first class seats per 185.
Agreed. I feel like its just an illusion because they have a dedicated compartment situated between doors positioned at 1/3, rather than just being chucked on the cab ends like other regional MUs like the 170s - which ironically have more first class seats per unit.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,693
Location
"Marston Vale mafia"
Personally, I'd have allowed TPE to order more 802s at the time of the first order and I'd have cascaded the 185s to Northern instead of ordering so many 195s. The 185s really were perfect for Barrow and Windermere.

Only doubled up. Single units were always overcrowded in Standard, and I resented having to upgrade to 1st to get a seat.

== Doublepost prevention - post automatically merged: ==

Agreed. I feel like its just an illusion because they have a dedicated compartment situated between doors positioned at 1/3, rather than just being chucked on the cab ends like other regional MUs like the 170s - which ironically have more first class seats per unit.

The end "ballroom" is about the worst design feature of them. Isolating the accessible toilet and multipurpose area (good for standees) from the rest of Standard was a terrible decision.

If they *had* to do it in a "third", the middle third would have been best (as per e.g. 350s) then aside from the wheelchair space the unit is symmetrical so it doesn't matter which way round it is, but the cab ends of non-gangwayed units are better for a reason - nobody needs to walk through and none of Standard is isolated the wrong side.
 

Aaron_TTL

Member
Joined
9 Jun 2022
Messages
248
Location
Scotland
They really need to sort out the 5 carriage Edi-Man routes, Both times I've been on them its been standing room only. Frustrating me so much so, I actively avoid TPE now and go for Avanti. Its just not an acceptable amount of carriages.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,693
Location
"Marston Vale mafia"
They really need to sort out the 5 carriage Edi-Man routes, Both times I've been on them its been standing room only. Frustrating me so much so, I actively avoid TPE now and go for Avanti. Its just not an acceptable amount of carriages.

Agreed - it would be sensible for some of these new units to be longer, perhaps 7 car would be a sweet spot for these.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,934
Location
Mold, Clwyd

The issue isn’t 5 car sets. The idea on paper when Virgin bought the Voyagers was amazing. Their operation princess failed because it was too successful. Cross Country attracted so many riders that trains got overcrowded. The worst part is that Virgin asked the DFT (or whoever was the regulator) to buy additional stock but they got rejected.

The irony there is that Virgin (with Richard Bowker then in the management team) bought the Voyagers, and a few years later the DfT (actually the SRA, then run by the same Richard Bowker) refused to "throw more money at XC" at a time when rail budgets were tight (no-growth franchises etc).
Railway budgets are tight now as well.
.

Aren't all these TOCs supposed to be merging under GBR ?

DfT has given no real clue as to how it will manage GBR TOCs.
They could be anything from being independent from each other the same as now, to being strung together in some regional or sector structure.
Currently not even the DOHL TOCs are integrated in any way except at the top reporting level to DfT.
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,924
Only doubled up. Single units were always overcrowded in Standard, and I resented having to upgrade to 1st to get a seat.

== Doublepost prevention - post automatically merged: ==



The end "ballroom" is about the worst design feature of them. Isolating the accessible toilet and multipurpose area (good for standees) from the rest of Standard was a terrible decision.

If they *had* to do it in a "third", the middle third would have been best (as per e.g. 350s) then aside from the wheelchair space the unit is symmetrical so it doesn't matter which way round it is, but the cab ends of non-gangwayed units are better for a reason - nobody needs to walk through and none of Standard is isolated the wrong side.
Even going back 10 plus years when they were fairly new I had a regular lady who was a wheelchair user who I assisted on to trains and she would specifically book to avoid TPE for the later leg of her journey as she resented being dumped, in her words, away from everyone else outside the toilet in that horrible tip up seat area like a bicycle in a guards van of old. I could see her point!
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,376
Location
belfast
There was certainly a plan to extend them, yes. But from day one they were really too short. Aside from commuter times TPE didn't have an overcrowding problem before their introduction, but as soon as they came in it got really bad, and wasn't resolved until the coming of the 802s.
As I understood it, before the order for the 185 the intention was for them to be longer and more numerous. The SRA then had both the order size and the length reduced before the order was finalised. If the SRA hadn't gotten involved, the 185s would have been larger on day one than they were
 

Krokodil

Established Member
Joined
23 Jan 2023
Messages
6,596
Location
Wales
Agreed - it would be sensible for some of these new units to be longer, perhaps 7 car would be a sweet spot for these.
This is becoming a theme with multiple TOCs over the last 25 years, isn't it? Five (or even four) coach units used on intercity services and proving to be grossly inadequate. Intercity stock shouldn't be less than seven coaches long. While we're at it, TPE was never the right home for the WCML services, it's too inefficient to run what is an almost independant micro-operation. Those should always have been part of the ICWC franchise and shared crew.

Regional express units should be universally 4/5 coaches (or multiples thereof) too.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,693
Location
"Marston Vale mafia"
This is becoming a theme with multiple TOCs over the last 25 years, isn't it? Five (or even four) coach units used on intercity services and proving to be grossly inadequate. Intercity stock shouldn't be less than seven coaches long. While we're at it, TPE was never the right home for the WCML services, it's too inefficient to run what is an almost independant micro-operation. Those should always have been part of the ICWC franchise and shared crew.

Agree. They were for a bit too - this was only changed to free Voyagers up, if I recall, because it was felt that TPE could stretch the 185 fleet to handle it on top of what they were already doing.

When new stock became on the cards, they really should have gone back to ICWC and the stock ordered by/for them.
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,718
Location
Leeds
I'd say built too short. A 5-car formation with the same amount of first class would have worked fairly well.

(It does seem that 5x24ish is a fairly sweet spot for a lot of regional express type services that don't go near London - but not XC!)
Respectfully disagree. A 5-car formation, where the extra two carriages are Standard with an accessible toilet, plus more First Class seating in the current wheelchair/vestibule area, would work for me (though you'd only be adding six seats and tables at most, and you'd lose four if you had an actual First Class wheelchair offering). But yes, 5-car minimum for TPE gets my vote.
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,621
Location
Isle of Man
Those should always have been part of the ICWC franchise and shared crew.
It was and it was moved to TPE precisely because it was a standalone route outside of the normal ICWC focus. When it was moved TPE had much more of a presence in the north west, with the Blackpool, Barrow, and Windermere services all being part of TPE too.

It stands out now because TPE lost the Blackpool, Barrow, and Windermere expresses back to Northern, to the detriment of the service.

When new stock became on the cards, they really should have gone back to ICWC and the stock ordered by/for them.
We’d have still just had five carriage CAF units on the route though!

The real problem has been just how well TPE has developed the route. It was always forgotten about when it was in VXC and VWC, I used it monthly in the VWC days and the 4-car Voyagers were often barely half full outside of the peaks. Now the 5-car CAFs are rammed all day every day.
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,573
Location
Macclesfield
It was and it was moved to TPE precisely because it was a standalone route outside of the normal ICWC focus. When it was moved TPE had much more of a presence in the north west, with the Blackpool, Barrow, and Windermere services all being part of TPE too.

The real problem has been just how well TPE has developed the route. It was always forgotten about when it was in VXC and VWC, I used it monthly in the VWC days and the 4-car Voyagers were often barely half full outside of the peaks. Now the 5-car CAFs are rammed all day every day.
Out of curiosity, when was Manchester - Scotland part of the VWC operation? My recollection of the transition period is hazy, but online sources, including previous discussions on this forum, seen to concur that it remained part of the Crosscountry operation until transferred to First TPE at the December 2007 timetable change, including a final four week period under the new Arriva administration of XC.
 
Last edited:

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,621
Location
Isle of Man
Out of curiosity, when was Manchester - Scotland part of the VWC operation? My recollection of the handover is hazy
I'll be honest, mine is hazy too, especially as the Virgin XC and Virgin WC operations were largely interchangeable. My recollection was that it was in Virgin WC after whichever timetable change split the services at Manchester, but this recollection may well be incorrect.
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,573
Location
Macclesfield
I'll be honest, mine is hazy too, especially as the Virgin XC and Virgin WC operations were largely interchangeable. My recollection was that it was in Virgin WC after whichever timetable change split the services at Manchester, but this recollection may well be incorrect.
Manchester - Preston was latterly shown as a spur off the main route of Virgin's VT1 timetable, which was Crosscountry South West - North West & Scotland. A DfT issued map from the time of the Arriva XC franchise award describes Manchester - Scotland as a "CrossCountry route until Dec 07 only". You're right that you'd struggle to slide a sheet of paper between the distinction between VWC and VXC at the time, though.
 

Stephen42

Member
Joined
6 Aug 2020
Messages
808
Location
London
RAIL have put out an article about the new fleet:
TransPennine Express gives details on new train fleet and expected operations

I don't have access but sounds like things are happening!
To quote the most relevant snippet about timings:
Jackson said the fleet may include level boarding while Major Projects Director Chris Nutton revealed that the operator has a “lead tenderer” and is now working with finance companies with the aim of revealing the winner this summer.

Nutton said the new trains were highly likely to be battery-electric stock, noting that it was difficult to buy diesel. The deal will include depots, stabling and maintenance, he added.
This sounds similar to where Southeastern are in the process and timeline for announcement.
 