flypie
Member
- Joined
- 5 Jan 2014
- Messages
- 225
If building a new junction would a 270 turn be acceptable it was composed of section of track that where used for other routes through the junction? and allowed the number of points on the high speed section to be reduced by 1?
I'm just considering how a Liverpool to HS2 junction might work with a through route to Manchester which doesn't use the main spine. The issue is the junction from Liverpool going North, which I suspect would be rather under used as might the Manchester North Junction, which is in the current HS2 plans.
I have attached an image which shows a line extending from the old Warrington Altrincham line, past HS2, lining directly to the Manchester spur, with a short chord links the line to the Manchester south curve, providing a Liverpool London ROute, these are in purple. The orange line carries on this curve on and eventually joins the main trunk heading north. If the Orange line was in place then the currently proposed Manchester north curve would be redundant.
I've tried to keep the cures to a 5 km radius, which would allow high speed running, though this may be ambitious.
I'm just considering how a Liverpool to HS2 junction might work with a through route to Manchester which doesn't use the main spine. The issue is the junction from Liverpool going North, which I suspect would be rather under used as might the Manchester North Junction, which is in the current HS2 plans.
I have attached an image which shows a line extending from the old Warrington Altrincham line, past HS2, lining directly to the Manchester spur, with a short chord links the line to the Manchester south curve, providing a Liverpool London ROute, these are in purple. The orange line carries on this curve on and eventually joins the main trunk heading north. If the Orange line was in place then the currently proposed Manchester north curve would be redundant.
I've tried to keep the cures to a 5 km radius, which would allow high speed running, though this may be ambitious.