Apologies if this has been covered elsewhere.
I was wondering whether an IC225 set has ever been push-pulled by 2 Class 91s (in the same configuration as an IC125) and if so, what was the acceleration like? Could 225s be extended to 11 coaches using 2 91s? I realise this would create a surplus of Mk4s however. Just interested in operability.
I am aware that shortly after the introduction of the 225s, Class 43s (the ones fitted with buffers) were used as a powered DVT for the sets. Also aware of OHLE wave caused by front panto and potential for rear panto not contacting the OHLE.
Looking forward to my second trip of the year on a 225 this afternoon from KGX-DON.
I was wondering whether an IC225 set has ever been push-pulled by 2 Class 91s (in the same configuration as an IC125) and if so, what was the acceleration like? Could 225s be extended to 11 coaches using 2 91s? I realise this would create a surplus of Mk4s however. Just interested in operability.
I am aware that shortly after the introduction of the 225s, Class 43s (the ones fitted with buffers) were used as a powered DVT for the sets. Also aware of OHLE wave caused by front panto and potential for rear panto not contacting the OHLE.
Looking forward to my second trip of the year on a 225 this afternoon from KGX-DON.