• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

2025 New Track Coverage

Status
Not open for further replies.

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,806
11th April

First time I've been to the EVR:

Wirksworth - Ravenstor
Wirksworth - Duffield

And Peak Rail has been extended in both directions since my only previous visit:

Rowsley South - Darley Dale
Matlock Riverside - Matlock
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Sunil_P

On Moderation
Joined
31 Oct 2022
Messages
521
Location
Ilford
26th April

After years of waiting, finally did Fulwell to Strawberry Hill eastbound, on outbound and inbound trains diverted to run via Twickenham for a rugby match (I didn't alight at Twickenham, mind!). Did the westbound journey (the standard evening peak service) back in 2018.
 

D841 Roebuck

Established Member
Joined
16 Mar 2012
Messages
2,128
Location
Rochdale
29/04/2025
Choppington Jc to Ashington

30/04/2029
Alnwick Lionheart to Greenrigg Halt.
 
Last edited:

Sunil_P

On Moderation
Joined
31 Oct 2022
Messages
521
Location
Ilford
29th May

Reprised Peterborough to Stamford both ways to account for the flying junction inserted to make space for Werrington dive-under. Tracks here were skewed, especially the up "slow" track. Previously there was no junction here on the "slow" tracks.
 

Cambus731

Established Member
Joined
19 Jul 2013
Messages
1,402
Location
Chelmsford
Finally did the Bolton and Embsay Railway last week. The day I did it there was a crew there filming for a Channel 5 programme.
 

Sunil_P

On Moderation
Joined
31 Oct 2022
Messages
521
Location
Ilford
22nd June

Bedford to Wellingborough via the down slow and Wymington Tunnel (northbound only).
Because of weekend engineering work requiring all Corby EMU trains to turn back at Wellingborough, and long distance DEMU trains to run via Corby.
 

Adam0984

Established Member
Joined
18 Feb 2014
Messages
1,211
A case of right place at the right time today managed Morpeth to Bedlington due to the Metro overheads falling down at Northumberland Park
Also a couple of new bits for me earlier the flyover from Hitchin to Letchworth and the Down ML and Up ML at Darlington
 
Last edited:

Sunil_P

On Moderation
Joined
31 Oct 2022
Messages
521
Location
Ilford
29th June

Upminster bay platform 1A to/from Ockendon
Connection from/to Barking platforms 7/8 to/from Upminster
 

D841 Roebuck

Established Member
Joined
16 Mar 2012
Messages
2,128
Location
Rochdale
15/06/2025
Tram route at East Anglia Transport Museum
Narrow Gauge railway at East Anglia Transport Museum

22/06/2025
Sittingbourne Viaduct to Kemsley Down (S&K Light Railway)

Both well worth a visit!
 

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,806
26th July

Churnet Valley Railway: Froghall - Ipstones
 

Cambus731

Established Member
Joined
19 Jul 2013
Messages
1,402
Location
Chelmsford
Yesterday I finally got round to catching a train from platform 3 at Maidstone East, therefore traversing the trailing crossover on the London side of Maidstone East.
 

Sunil_P

On Moderation
Joined
31 Oct 2022
Messages
521
Location
Ilford
6th August

Heald Green South to Heald Green North (avoiding Manchester Airport) both ways.
Avanti/CrossCountry diversions due to Stockport block.

Had a bit of a scare on the outbound journey - was detrained from the 1033 ex-Euston at Crewe due to points failure at Wilmslow, but the next Avanti to arrive (1053 ex-Euston) completed the journey into Manchester!
 

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,806
22nd August

Bradford Forster Square Platform 0.

I wouldn't normally go down to that level, but it is local and new.
 

Turbo004

Member
Joined
3 Feb 2017
Messages
231
24th August

Northallerton Southbound Diveunder
Completed at the fourth attempt.

Just four more lines in Britain to do.
 

Sunil_P

On Moderation
Joined
31 Oct 2022
Messages
521
Location
Ilford
31st August

Plaistow bay platform (in and out) - unexpected reversals (also involving the through platforms) due to signal probs at Upton Park.
 

Sunil_P

On Moderation
Joined
31 Oct 2022
Messages
521
Location
Ilford
9th September

The Southend Cliff Railway, often described as a "funicular", but as it has only a single track/car and a counterbalance weight, it's really an Inclined Lift (as found at Greenford, Farringdon and Liverpool Street). Tried doing it back in 2022, but it was closed!
 

Sunil_P

On Moderation
Joined
31 Oct 2022
Messages
521
Location
Ilford
17th September
Northallerton avoider northbound (1527 LNER ex-King's Cross)

18th September
Whitby to Middlesbrough westbound (eastbound only done in 2018)
Reprised Meadowhall to Meadowhall South/Tinsley (Supertram) both ways to account for junction towards Rotherham

(Tried also Aldwarke-Thrybergh-Mexborough, but the 1543 ex-Reading was nearly 20 minutes late reaching Sheffield, and it went via Swinton!)
 

sh24

Established Member
Joined
28 Sep 2023
Messages
1,471
Location
London
Points failure meant a Pendolino over the down reception road to Carlisle Kingmoor Yard
 

Attachments

  • IMG_4864.png
    IMG_4864.png
    388.5 KB · Views: 12

Turbo004

Member
Joined
3 Feb 2017
Messages
231
Lichfield North Junction - Lichfield Trent Valley Junction

and Central Rivers Depot

all done in the cab of a Class 197.
Without doubts one of the highlights of travelling by rail of my life.
 
Status
Not open for further replies.

Top