BerkshireRails
On Moderation
Would the mainline section be easier for the 2024 stock, as there is already a lot of AC traction on the line? In addition, would NR be responsible for fitting co-actors if required for the NR part? When the time comes, will the Bakerloo Line use ETCS, the national standard signalling system?Signals would still need immunisation, co-actors provided where necessary, platform and tunnel gauging would also still be required.
Would the Jubilee Line receive a different sort of 2024 stock to match the Platform Edge Doors, or would the Platform Edge Doors be modified for the 2024 stock, which would require a closure of the Jubilee Line between Green Park and Stratford (London)?

Platform Edge Doors at London Waterloo Jubilee Line Extension.