wensley
Established Member
Following radiator repairs 20166 has been started for the first time at Wensleydale Rly. Following a few other jobs the loco will be performing 100 shake-down miles before being ready to play.
a working loco on the railway?
ah good news, useful are 20's, just waiting for 47540 and the 25 then, good look on 540...![]()
I may be missing something, but unless you've added a cab, how has it taken power at both ends?20166 has now taken power both ends and has shuttled up and down the headshunt at Leeming Bar with some healthy whilstling!!
I may be missing something, but unless you've added a cab, how has it taken power at both ends?
I'm guessing he mean's it is taking power from power desk's.