northwichcat
Veteran Member
This represents a 7% increase over the 2013-14 figure, compared with a 14% increase recorded for Navigation Road. By itself, the figures would suggest that Altrincham's rail platforms were closed, or at least that access to them was restricted (whether from the road, from Metrolink or for 'bus passengers) for part of the 2014-15 reporting year. I don't know what was actually happening with the station, though.
Both platforms 3 and 4 (the heavy rail platforms) remained open, except for a couple of Sundays while the new bridge was lifted in to place and the old one removed. Although how they were accessed from Stamford New Road changed and the old bus station was demolished and replaced by a new one meaning buses stopped at temporary bus stops. The ticket office was also closed and replaced by a temporary one on platform 4 - I think that's the real reason for the apparent drop in usage for 14/15.