20:25 Euston-Wolverhampton diversion

Status
Not open for further replies.

willc789

Member
Joined
25 Jul 2012
Messages
88
Was on the 20:25 off of Euston to New Street last night expecting a simple jaunt up the normal route but we were sent via Northampton adding a bit onto the journey time. Can anyone spill any light as to why it went this way round?

Also, out of interest, how much longer/slower is via Northampton? Is tilt or 125mph running available?

Cheers in advance!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Searle

Established Member
Joined
4 May 2012
Messages
1,580
Location
Ladbroke Grove
It seems like you were meant to be routed via Weedon, but you didn't for some reason, so you were 18 down at Rugby and 20 down at Coventry, so I'd say it took about 18-20 minutes slower :P I'm pretty sure 125mph running isn't available but I don't know what the top speed is.

1G44
 

dvboy

Established Member
Joined
6 Sep 2011
Messages
2,039
Location
Birmingham
From what I understand from overhearing some Virgin trains staff last night, the overhead line damage at Wolverton earlier in the week needed more work over the weekend and NR took possession earlier than they normally would.

You were only 20 down at Coventry, and made more than half that time up at Birmingham as it has a 12 minute timed stop at Birmingham New Street.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,914
Location
Mold, Clwyd
It seems like you were meant to be routed via Weedon, but you didn't for some reason, so you were 18 down at Rugby and 20 down at Coventry, so I'd say it took about 18-20 minutes slower :P I'm pretty sure 125mph running isn't available but I don't know what the top speed is.

1G44

100 almost to Northampton, 75 onwards to Rugby.
No tilt: there was an SRA plan to implement tilt on the Northampton loop and other diversionary VT routes but it got canned.
I'd say about 15 minutes is the minimum extra time on the loop.
 

willc789

Member
Joined
25 Jul 2012
Messages
88
Thanks for all the replies. I only noticed the diversion after loosing the time and not feeling the tilt/speed for a fair while. Are the Virgin services frequently routed via Northampton?

Also what would be the ball park cost and time saving of taking the line up to tilt capability?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,914
Location
Mold, Clwyd
Thanks for all the replies. I only noticed the diversion after loosing the time and not feeling the tilt/speed for a fair while. Are the Virgin services frequently routed via Northampton?

Also what would be the ball park cost and time saving of taking the line up to tilt capability?

There is a vague plan called Journey Time Improvements, Northampton to Rugby, in the CP5 Plan (2014-19).
I think this is to raise line speed from 75mph to 90mph.
That would save about a couple of minutes, mainly for LM.
I don't think tilt was envisaged (which would only be of benefit to VT).
 