Modern Railways said:With 'Pioneer' set No. 222103 still out of use awaiting repairs following damage at Crofton depot, Hull Trains has secured a 2+5 HST through Porterbrook Leasing. The set is formed from out of use Midland Mainline vehicles and the company hopes to have it operational in three to give months following C4/C6 work on the trailer cars and intermediate overhaul and reinstatement work on the power cars which is currently being sources. The set is expected to see Hull Trains through until the return of No. 222010, which is expected to take another 12 months. Insiders at the company are still unavailable to confirm whether the two damaged vehicles can be repaired or new bodyshells will be required.
Tony Miles