Hindsight can be a wonderful thing if we could actually use it. With UK railway progress generally behind our European counterparts, let’s say you could go back in time and oversee the BR modernisation plan from 1955. What would you do differently compared to what actually happened?
Some things I would have done:
Some things I would have done:
- Commit to a rolling electrification programme over a 50 year period, starting with the most important mainlines (ideally WCML, ECML, GWML, MML, GAML and Chiltern within the first 20 years) while keeping full cohorts of skilled workforce and technology right up until 95% of the network is electrified. SWML west of Woking to be electrified with 25KV AC. Some smaller branch lines get away with battery operation as technology improves over time.
- Build a centrally planned Intercity rail network, with a trunk line from London to Birmingham and branches to Manchester and Leeds (sound familiar) opening in the 1980s. Passive provision provided for future lines from Manchester to Scotland, Leeds to Newcastle, London to Swansea and Birmingham to Plymouth, opening by the 2020s.
- Commit to a standard class of rolling stock for each service group (Intercity, Regional, Commuter/Metro) from each power type (25kv, 750v, diesel) with a centrally planned cascade and scrappage scheme keeping up with gradual electrification progress.
- Quad tracking of all mainlines with mixed passenger and freight traffic. Loading gauge increased to take double deck trains and wider freight containers
- Upgrade the Settle & Carlisle Line to become a key Anglo-Scottish freight route
- Close the Hope Valley Line while keeping Woodhead and Matlock - Buxton open
- Close the Island Line
- Removal of some suburban railways (Merseyrail, Valley Lines etc) from the National Rail network, transferring infrastructure and operations to local ownership