• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

180 at Welwyn Garden City

Status
Not open for further replies.

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,803
Location
Central Belt
I see a 180 in the sidings near Welwyn Garden City station today.

normally when they are there they are failed?

however is this set getting used for testing the signalling? Trying to be positive rather than the normal reason. The route is closed but I have seen trains running to / from Welwyn Garden City today.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,192
I would believe that, in conjunction with the NR Class 43s, this is in relation to ETCS high speed testing.

How many of the 14 Class 180 units are fitted with the Alstom ETCS.
 

_toommm_

Established Member
Joined
8 Jul 2017
Messages
6,301
Location
South West London
It came down last night as the following:

And is operating on Sunday between Finsbury Park and Huntingdon:
https://www.realtimetrains.co.uk/service/gb-nr:N36917/2024-12-01/detailed etc.

It'll then return on Monday:
 

Discuss223

Member
Joined
30 Oct 2024
Messages
375
Location
Rowsley
I see a 180 in the sidings near Welwyn Garden City station today.

normally when they are there they are failed?

however is this set getting used for testing the signalling? Trying to be positive rather than the normal reason. The route is closed but I have seen trains running to / from Welwyn Garden City today.
Good evening. There is route upgrade works taking place on the day in question 30/11/2024. Various services on the East Coast Mainline are stopping and starting at stations north of King's Cross. It may well be that the unit you saw was awaiting its next service northwards. You are also correct, in that it could be for signalling upgrades relating to the specific unit. All units on the ECML are going to require a specific type of signalling capability soon, the name evades me but it's something like *EHTS or something. It was confirmed in the Class 221 thread that the Class 180s will be getting this signalling modification applied, as they are planned to continue operation on the line indefinitely.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,192
It was confirmed in the Class 221 thread that the Class 180s will be getting this signalling modification applied, as they are planned to continue operation on the line indefinitely.
How many of the Class 180 units are currently fitted with the Alstom ETCS?
 
Status
Not open for further replies.

Top