There's certain types of unit that would benefit from extra coaches (e.g. Voyagers), but since the production line has ended, it'd be prohibitively expensive to build more.
However, the current orders of three coach 172s (London Midland etc) means that Turbostar centre coaches are being built.
Now, excuse my ignorance here, but would it be possible to build 170 centre coaches whilst they are at it?
The reason I'm wondering is that, since ScotRail use a number of 158s coupled to 170s, or "double" 170s on a regular basis, they *could* get extra centre coaches to make a five/ six coach "super 170". This would mean some of the existing 158s could be cascaded south, plus maybe some of the 170s also cascaded as two car units (with the old centre coaches being part of the 5/6 car "super 170s").
As building centre coaches sounds cheaper than building an equivalent number of "end" coaches, this may be a cheaper solution to getting capacity enhanced on a few franchises.
For example:
1. built a dozen Turbostar centre coaches
2. stick these into six ScotRail 170s (to make a five car unit)
3. run these "super 170s" on routes like the Aberdeen ones that are currently five coaches (but currently run by attaching a 158 to a 170)
4. This gives enough spare 158s to send half a dozen down to Northern/ EMT/ FGW etc
OR
1. built a dozen Turbostar centre coaches
2. stick these into four ScotRail 170s (to make a six car unit)
3. run these "super 170s" on routes like the "shuttle" that are currently six coaches (but currently run by attaching two 170s)
4. This gives four two car 170s to send down to TPE/ London Midland etc
(obviously the above could be done on a greater scale, I'm just using the example of a dozen new centre coaches to illustrate the potential. And, yes, the "shuttle" units won't be needed after the line is electrified, I know...)
The only thing I'm unsure about is whether they could build centre coaches capable of 170 speeds, or whether they'd need to be restricted to 172 speed...
However, the current orders of three coach 172s (London Midland etc) means that Turbostar centre coaches are being built.
Now, excuse my ignorance here, but would it be possible to build 170 centre coaches whilst they are at it?
The reason I'm wondering is that, since ScotRail use a number of 158s coupled to 170s, or "double" 170s on a regular basis, they *could* get extra centre coaches to make a five/ six coach "super 170". This would mean some of the existing 158s could be cascaded south, plus maybe some of the 170s also cascaded as two car units (with the old centre coaches being part of the 5/6 car "super 170s").
As building centre coaches sounds cheaper than building an equivalent number of "end" coaches, this may be a cheaper solution to getting capacity enhanced on a few franchises.
For example:
1. built a dozen Turbostar centre coaches
2. stick these into six ScotRail 170s (to make a five car unit)
3. run these "super 170s" on routes like the Aberdeen ones that are currently five coaches (but currently run by attaching a 158 to a 170)
4. This gives enough spare 158s to send half a dozen down to Northern/ EMT/ FGW etc
OR
1. built a dozen Turbostar centre coaches
2. stick these into four ScotRail 170s (to make a six car unit)
3. run these "super 170s" on routes like the "shuttle" that are currently six coaches (but currently run by attaching two 170s)
4. This gives four two car 170s to send down to TPE/ London Midland etc
(obviously the above could be done on a greater scale, I'm just using the example of a dozen new centre coaches to illustrate the potential. And, yes, the "shuttle" units won't be needed after the line is electrified, I know...)
The only thing I'm unsure about is whether they could build centre coaches capable of 170 speeds, or whether they'd need to be restricted to 172 speed...