This time last year, that was on the cards. Adonis has since decided that a bit of electrification will sort the problem out.
To be honest, a mass order of 2-400 DMUs is the only thing which will sort this out. 172s with corridors would do nicely.
I disagree on this one, when the DMU's have a 30 year life span building more would be crazy. It takes as long to build an EMU as it does a DMU so I think in this case Adonis is right use more EMU's! Some of the short distance electrifications could possibly done in the same time as it take EMU's / DMU's to be built.
Get the Deisels running under the wires away to cascade them to areas that need them.
You don't have to look very hard to find examples. SWT has 158 diagrams on 3rd rail routes throughout the day, these should be replaced by EMU's to get the 158's back into areas that need them. I have already mentioned the voyagers and HST on East Coast that are all wired daigrams.
There are also many examples people can mention of short schemes that will enable EMU running throughout, the Manchester / Liverpool area is a good example of this. The Scottish routes will also release a lot of DMU's back into the pool (Edinburgh - Glasgow, Edinburgh & Glasgow - Dunblane, Glasgsow - Anniesland, Glasgow - Larbert via Cumbernauld).
For lines which will never be viable to wire up then probably have enough DMU's from the 16x and 17x era to keep these lines going for quite a while, then who knows what technology will be around?
We need these coaches now, but removing 100% workings under the wires is a better start. I know people will argue that the Voyagers allow Virgin to work diiversions away from the wires, but surely a 57/3 is more suitable as they are not doing it every day!