• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

15 Carriage Hitachi Class 800

Status
Not open for further replies.

J663738

Member
Joined
20 May 2025
Messages
339
Checking for my times of my train home from Newport (Wales) on RTTs and saw that a 15 carriage GWR was on its way! I assumed it could be possible as the extra attached 5 carriages might just be empty and were being transported somewhere.
Sadly I video'ed the train as it left the platform and you guessed it, there was only 10 carriages. :(

This was the information, presume it was an error made when 5 car trains join together at Swansea, the software joined a 10 and a 5 by mistake.

https://www.realtimetrains.co.uk/service/gb-nr:P08499/2025-08-07/detailed#allox_id=1

Could they ever be configured like this?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,301
Location
Glasgow
Checking for my times of my train home from Newport (Wales) on RTTs and saw that a 15 carriage GWR was on its way! I assumed it could be possible as the extra attached 5 carriages might just be empty and were being transported somewhere.
Sadly I video'ed the train as it left the platform and you guessed it, there was only 10 carriages. :(

This was the information, presume it was an error made when 5 car trains join together at Swansea, the software joined a 10 and a 5 by mistake.

https://www.realtimetrains.co.uk/service/gb-nr:P08499/2025-08-07/detailed#allox_id=1

Could they ever be configured like this?
10 is the limit in normal service.

What's likely happened is a unit has been exchanged for another one and the original hasn't been deleted from the allocation, so it appears as a extra-long train!

We've seen similar with 22-car Pendolinos and 18-car Azumas appearing as allocations from time-to-time.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,515
Location
Northampton
Definitely a set-swap or allocation thing, pretty sure Swansea wouldn't take a 15-car!

I think long formations have operated on test and they are theoretically possible for rescue purposes but normally as @hexagon789 says 10 is the limit.
 

Towers

Established Member
Joined
30 Aug 2021
Messages
2,983
Location
UK
It’s mentioned before in a similar thread I’m sure, but there was a rather high profile 15 car formation during a rescue which failed at Southall some years ago, blocking just about everything!
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,322
As had been stated many many times before, a set swap has taken place, this will of been done correctly in the back ground systems, but for some reason this takes times to work its way through to RTT, or sometimes does not happen.

You will never get more than a 10 car set allocated for passenger use.

You would only ever see a 14/15 or 18 car set when a failed unit needs rescuing which is still a very rare move to happen.
 

Wilts Wanderer

Established Member
Joined
21 Nov 2016
Messages
3,199
There were originally plans for 9+5 cars to attach for ECS moves between Stoke Gifford depot and Bristol Parkway but I believe the operational challenges and possibly also software issues meant this never happened. It would never be planned in passenger service, mainly because very few platforms could accommodate 364m of train!
 
Status
Not open for further replies.

Top