Trainbike46
Established Member
I picked york-darlington because:Precisely my point! Increasing the speed envelope (i.e. the highest speed traffic and the lowest speed traffic) eats into capacity. How much time are you going to save between York and Darlington, and at what cost?
- no stopping service, so no capacity impacts as it is possible to speed up all services
- Identified earlier in this thread to have an alignment capable (or almost capable) of 140 mph
- long stretch, so more benefits
So, as far as I can tell it would need signalling upgrades and probably OHLE upgrades. If those are done when the existing system need upgrading premiums may be limited, definitely for signalling, though probably not for OHLE.
Distance is just over 44 miles, so would take 22 minutes at 125 mph, currently timetabled for 25 minutes. At 140 mph it would take 19 minutes, so a saving of about 3 minutes.
== Doublepost prevention - post automatically merged: ==
In any case, the premise of this thread was: "where would it be realistic to increase rail speeds to 140 mph?"
And there is of course loads of factors, including capacity impacts, but I think york-darlington is one of the more realistic options
Last edited: