• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

125mph non tilt live on WCML

Status
Not open for further replies.

Tilting007

Member
Joined
21 Oct 2024
Messages
261
Location
Rugby
To add to this, once the 730's go north of Rugby, they are stopping every 10 or so minutes, so I'd agree with you that there would be very little gain.
Lots to gain if the 75mph sections on the slow lines were increased…
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,129
Location
Wilmslow
Summary of Compatibility
Thank you.
I found, albeit possibly garbled by AI at https://www.google.com/search?client=firefox-b-m&q=network rail summary of compatibility
A Network Rail Summary of Compatibility (NRSC) is a document required under
RIS-8270-RST to confirm that new, modified, or cascaded rolling stock is technically compatible with specific infrastructure, such as gauging, power systems, and signalling. It acts as a final assurance check for operators to safely run trains, often feeding into the Statement of Compatibility (SOCAT).
Key details regarding the Summary of Compatibility:
  • Purpose: Ensures rolling stock works safely with Network Rail infrastructure, covering electromagnetic, gauge, and power compatibility.
  • Requirement: Mandatory when introducing, modifying, or transferring (cascading) trains.
  • Key Components: Involves identifying relevant stakeholders, building a compatibility matrix, and ensuring compliance with standards like GERT8015 for electromagnetic compatibility.
  • Process: The proposer of the change (e.g., train operator) must complete the compatibility assessment, often resulting in a Statement of Compatibility (SOCAT) or similar authorization.
The NRSC is crucial for managing technical risk and ensuring that new or modified equipment does not negatively impact network safety.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,848
The NMT can run at MU and the LSL will be the same, so not much - circa 30 miles total of 125mph between Euston and Weaver Jn.
Certainly plenty of 115/120..
And any other HST, presumably.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,517
Location
Lichfield
It is the same gain than them running at MU speeds where the linespeed is below 110mph - a linespeed improvement…

No I get that, but my post was in response to the suggestion of uprating the 730 to operate above 110mph rather than infrastructure upgrades...
 

Markuk

Member
Joined
16 Mar 2021
Messages
44
Location
Northamptonshire
I'm surprised there's no EPS line speeds on the 75mph parts of the slow lines, even Pendolinos are limited to 75 between Northampton and Rugby
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,691
Location
Nottingham
I'm surprised there's no EPS line speeds on the 75mph parts of the slow lines, even Pendolinos are limited to 75 between Northampton and Rugby
There are many other factors that need to be considered when setting the speed besides curvature, most of which would cost money to resolve. For a non-routine movement such as this, either nobody ever considered providing an EPS speed, or it was looked into but one or more of the other factors made it not worth doing.
 

andy33gmail

Member
Joined
23 Mar 2025
Messages
302
Location
cambridgeshire
Isn't it a rule about having a non passenger zone at the front and rear of units allowed 125 mph? Hence why Voyagers and to an extent 80x are a bit wasteful of space. Older trains either had two power cars or an engine and DVT.
“Could passengers in the front part of the train move to the next carriage, since this service is running late”
 

whoosh

Established Member
Joined
3 Sep 2008
Messages
1,892
Isn't it a rule about having a non passenger zone at the front and rear of units allowed 125 mph? Hence why Voyagers and to an extent 80x are a bit wasteful of space. Older trains either had two power cars or an engine and DVT.
A rule, or standard, came about from the Polmont crash in the 1980s, where a push/pull class 47/DBSO set hit a cow and derailed with the DBSO leading. A DBSO was a 'Driving Brake Standard Open' Mark 2 coach with a driving cab.
Following the crash, trains with passengers in the leading vehicle were limited to 100mph - which explains the Driving Van Trailers (DVTs) that entered service on the West Coast (Mark 3s) and East Coast (Mark 4s) which operated on trains which went 110mph and 125mph respectively.
Later, there was a relaxation, and passengers were allowed, but not in the front third of the vehicle, and the first so many seats had to be backwards facing (Voyagers, Meridians and Pendolinos). On Meridians there was a notice in the galley end vehicle that only one person was allowed between the external crew doors and the internal door to the driving cab (as this was the crumple-zone!).
I think there has been a further relaxation if certain crashworthiness conditions are met.

A train with a corridor connection on the front - effectively a full height hole - would struggle to comply.

There are other factors with an upgrade to speed to consider - Class 717s were being tested to raise their speed from 85mph to 100mph. There was a sticking point with the windscreen wiper being able to function correctly - not lifting off the screen at the higher speed - which needed to be addressed.
I have not heard anymore about the test runs that were done on 717s - it seems to have gone very quiet, so don't know if that was actually resolved.
I seem to remember class 373 Eurostar sets were only allowed 110mph on the ECML when they ran domestic Leeds services.
So no guarantee that high speed stock can run at 125mph on classic lines.
Something to do with OHLE power limitation I think.
There was a limit on how many 373s could run at a time in each electrical section, yes.

I think there may have been a limitation of the catenary and pantograph relationship as well, in that the pantograph was designed to run on highly taut French catenary at high speed, and so the upward force it had was set up for that. The ECML catenary, with it's different parameters - with the contact wire drooping between each stanchion - I don't think it was considered able to take the force of the 373's pantograph at high speed, and so a 110mph restriction was put on them.

I may have got that wrong, but I seem to recall that as an issue as well as the power limitation (the horsepower they had compared to a class 91 was in a different league!).
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,852
There are many other factors that need to be considered when setting the speed besides curvature, most of which would cost money to resolve. For a non-routine movement such as this, either nobody ever considered providing an EPS speed, or it was looked into but one or more of the other factors made it not worth doing.

It was ruled out very, very early on during West Coast Route Mod.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,923
Location
Mold, Clwyd
I'm surprised there's no EPS line speeds on the 75mph parts of the slow lines, even Pendolinos are limited to 75 between Northampton and Rugby

There are many other factors that need to be considered when setting the speed besides curvature, most of which would cost money to resolve. For a non-routine movement such as this, either nobody ever considered providing an EPS speed, or it was looked into but one or more of the other factors made it not worth doing.
The SRA (in mid-WCRM) did say they were investigating implementing EPS speeds on PS 75mph sections like the Northampton loop and the Grand Junction route in the West Midlands (Stechford-Aston-Bescot-Bushbury), but it didn't get anywhere.
They also promised EPS 90mph on the Queensville Curve at Stafford, but it ended up as 85.
 
Last edited:

cambsy

On Moderation
Joined
6 Oct 2011
Messages
1,112
are 805-807’s reliably running at the MU Speeds? I am asking as looking to try out the MU Speeds again, as first time tried, my service didn’t have DAS set up, as was tight turn around for my service at Liverpool Lime Street. I dont want to try sample MU speeds and end up failing again.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,852
are 805-807’s reliably running at the MU Speeds? I am asking as looking to try out the MU Speeds again, as first time tried, my service didn’t have DAS set up, as was tight turn around for my service at Liverpool Lime Street. I dont want to try sample MU speeds and end up failing again.

My last 8 trips on them have all been at MU speed.
 

Paul AC

Member
Joined
3 Aug 2025
Messages
241
Location
Timperley
I'm surprised by that too, given the usefulness of the Northampton Loop for diversions (as indeed happened to my train, 1M08 0736 Glasgow C-Euston today!) whenever an issue affects the main line between Rugby and Hanslope.
Isn't the 75 mph limit as much due to the 3-aspect signalling and the signal spacing as the state of the track?
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,575
Location
Neilston, East Renfrewshire
Isn't the 75 mph limit as much due to the 3-aspect signalling and the signal spacing as the state of the track?

I don't know, sorry, but it is something worthwhile addressing; Having been diverted via Northampton on Friday 13th as per my Post #57, I was again diverted via Northampton on my return north on Tuesday, on 1S45 0827 Euston-Glasgow C!
 
Status
Not open for further replies.

Top