Tilting007
Member
Lots to gain if the 75mph sections on the slow lines were increased…To add to this, once the 730's go north of Rugby, they are stopping every 10 or so minutes, so I'd agree with you that there would be very little gain.
Lots to gain if the 75mph sections on the slow lines were increased…To add to this, once the 730's go north of Rugby, they are stopping every 10 or so minutes, so I'd agree with you that there would be very little gain.
SoC please?LUMO requires a SoC for MU running. Currently limited to a test SoC and 110mph PS max speed.
Summary of CompatibilitySoC please?
Thank you.Summary of Compatibility
A Network Rail Summary of Compatibility (NRSC) is a document required under
RIS-8270-RST to confirm that new, modified, or cascaded rolling stock is technically compatible with specific infrastructure, such as gauging, power systems, and signalling. It acts as a final assurance check for operators to safely run trains, often feeding into the Statement of Compatibility (SOCAT).
Key details regarding the Summary of Compatibility:
The NRSC is crucial for managing technical risk and ensuring that new or modified equipment does not negatively impact network safety.
- Purpose: Ensures rolling stock works safely with Network Rail infrastructure, covering electromagnetic, gauge, and power compatibility.
- Requirement: Mandatory when introducing, modifying, or transferring (cascading) trains.
- Key Components: Involves identifying relevant stakeholders, building a compatibility matrix, and ensuring compliance with standards like GERT8015 for electromagnetic compatibility.
- Process: The proposer of the change (e.g., train operator) must complete the compatibility assessment, often resulting in a Statement of Compatibility (SOCAT) or similar authorization.
Apologies - thanks to hexagon789!SoC please?
System on a Chip in my world, but I didn’t think it was that!Apologies - thanks to hexagon789!
And any other HST, presumably.The NMT can run at MU and the LSL will be the same, so not much - circa 30 miles total of 125mph between Euston and Weaver Jn.
Certainly plenty of 115/120..
Lots to gain if the 75mph sections on the slow lines were increased…
It is the same gain than them running at MU speeds where the linespeed is below 110mph - a linespeed improvement…That's nothing to do with the 730's though, is it?
If there are any others?And any other HST, presumably.
Lots to gain if the 75mph sections on the slow lines were increased…
There is at both the bottom end south of Amington and the north end on the Up linked to Handsacre…But there’s no plans for that?
There is at both the bottom end south of Amington and the north end on the Up linked to Handsacre…
It is the same gain than them running at MU speeds where the linespeed is below 110mph - a linespeed improvement…
Yes. The 125 Group’s preserved set.If there are any others?
There are many other factors that need to be considered when setting the speed besides curvature, most of which would cost money to resolve. For a non-routine movement such as this, either nobody ever considered providing an EPS speed, or it was looked into but one or more of the other factors made it not worth doing.I'm surprised there's no EPS line speeds on the 75mph parts of the slow lines, even Pendolinos are limited to 75 between Northampton and Rugby
“Could passengers in the front part of the train move to the next carriage, since this service is running late”Isn't it a rule about having a non passenger zone at the front and rear of units allowed 125 mph? Hence why Voyagers and to an extent 80x are a bit wasteful of space. Older trains either had two power cars or an engine and DVT.
A rule, or standard, came about from the Polmont crash in the 1980s, where a push/pull class 47/DBSO set hit a cow and derailed with the DBSO leading. A DBSO was a 'Driving Brake Standard Open' Mark 2 coach with a driving cab.Isn't it a rule about having a non passenger zone at the front and rear of units allowed 125 mph? Hence why Voyagers and to an extent 80x are a bit wasteful of space. Older trains either had two power cars or an engine and DVT.
There was a limit on how many 373s could run at a time in each electrical section, yes.I seem to remember class 373 Eurostar sets were only allowed 110mph on the ECML when they ran domestic Leeds services.
So no guarantee that high speed stock can run at 125mph on classic lines.
Something to do with OHLE power limitation I think.
There are many other factors that need to be considered when setting the speed besides curvature, most of which would cost money to resolve. For a non-routine movement such as this, either nobody ever considered providing an EPS speed, or it was looked into but one or more of the other factors made it not worth doing.
I'm surprised there's no EPS line speeds on the 75mph parts of the slow lines, even Pendolinos are limited to 75 between Northampton and Rugby
The SRA (in mid-WCRM) did say they were investigating implementing EPS speeds on PS 75mph sections like the Northampton loop and the Grand Junction route in the West Midlands (Stechford-Aston-Bescot-Bushbury), but it didn't get anywhere.There are many other factors that need to be considered when setting the speed besides curvature, most of which would cost money to resolve. For a non-routine movement such as this, either nobody ever considered providing an EPS speed, or it was looked into but one or more of the other factors made it not worth doing.
so not too many in total, the scope is very small but LSL challenged very strongly for their HSTs to run at the MUs.Yes. The 125 Group’s preserved set.
Romic, WRC, .......so not too many in total, the scope is very small but LSL challenged very strongly for their HSTs to run at the MUs.
so not many as mentioned above, not enough to greatly impact the performance on the WCML, but beneficial anyway. NMT is making good use of them.Romic, WRC, .......
even Pendolinos are limited to 75 between Northampton and Rugby
are 805-807’s reliably running at the MU Speeds? I am asking as looking to try out the MU Speeds again, as first time tried, my service didn’t have DAS set up, as was tight turn around for my service at Liverpool Lime Street. I dont want to try sample MU speeds and end up failing again.
Isn't the 75 mph limit as much due to the 3-aspect signalling and the signal spacing as the state of the track?I'm surprised by that too, given the usefulness of the Northampton Loop for diversions (as indeed happened to my train, 1M08 0736 Glasgow C-Euston today!) whenever an issue affects the main line between Rugby and Hanslope.
Isn't the 75 mph limit as much due to the 3-aspect signalling and the signal spacing as the state of the track?