Tilting007
Member
Correct - plus several geo-tech (earthwork) issues.Isn't the 75 mph limit as much due to the 3-aspect signalling and the signal spacing as the state of the track?
Correct - plus several geo-tech (earthwork) issues.Isn't the 75 mph limit as much due to the 3-aspect signalling and the signal spacing as the state of the track?
I think there was an axle counter failure at Blisworth Tuesday!I don't know, sorry, but it is something worthwhile addressing; Having been diverted via Northampton on Friday 13th as per my Post #57, I was again diverted via Northampton on my return north on Tuesday, on 1S45 0827 Euston-Glasgow C!
And tight clearances in the tunnels maybeIsn't the 75 mph limit as much due to the 3-aspect signalling and the signal spacing as the state of the track?
I don't know, sorry, but it is something worthwhile addressing; Having been diverted via Northampton on Friday 13th as per my Post #57, I was again diverted via Northampton on my return north on Tuesday, on 1S45 0827 Euston-Glasgow C!
Living at Northampton it seemed unfortunate that, of the £1,000,000,000 (approx) spent on the "West Coast Modernisation" approximately - err - £0 was spent on the Northampton loop.
You’re out by a factor of 10 on the total cost, and a factor of infinity on the Northampton loop!
But, seriously, what improvements were made on the Loop?
Resignalling, and lots of track renewal.
Wasn't the line south of Northampton station upgraded to 100mph, as on the slow lines further south?But not for higher line speeds?!!
Wasn't the line south of Northampton station upgraded to 100mph
But not for higher line speeds?!!
Wasn't the line south of Northampton station upgraded to 100mph, as on the slow lines further south?
Plus improvements at the Rugby/Hillmorton end, and new freight connections.

100 on the Down New to the M1.
And yes much improved into / out of Rugby.
I forgot to mention upgraded power supplies, so the trains can accelerate faster![]()
I had thought that the signals had only been fitted with energy saving LED bulbs in new heads, my mistake.
Is there not an instruction that LNw drivers should not pull away on full power?
That I don’t know. I would hope that all drivers of all trains pull away on full power at every station where conditions, linespeeds and signalling allow; that is what the timetable is usually designed for!
Were the improvements to the Northampton Loop discussed above what was originally planned, or was more intended and subsequently not taken forward? If the latter, what was intended?