Does anyone know how difficult or expensive an upgrade it would be to get the GEML up to 125mph (and 140mph capable with further upgrades, eg digital signalling)?

I’ve tried searching the forum but can’t find anything.

Thank you
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,343
Does anyone know how difficult or expensive an upgrade it would be to get the GEML up to 125mph (and 140mph capable with further upgrades, eg digital signalling)?

I’ve tried searching the forum but can’t find anything.

Try this one from 2013 in the first instance
https://www.railforums.co.uk/threads/ic225-for-geml.88110/page-3#post-1534909
If the crossings were sorted, the signalling upgraded, the OLE retensioned, the power supply strengthened, the track maintenance enhanced (considerably), some bridges rebuilt, some embankments strengthened, places of (staff) safety provided for 100mph+ operation, some track renewed to 100mph+ standards, some of the curves realigned, and some junctions removed altogether, then most of the route is fit for 125. Exceptions are through Chelmsford, Colchester, Manningtree and Ipswich station areas but trains would be stopping there.

Assuming 125 where it is currently 100, and a train of Pendolinesque characteristics, the journey time saving London-Norwich is approx 8mins on today's stopping pattern. Roughly half this saving is due to the better acceleration / braking of the train, and half is due to the raised line speeds. This assumes that all the slower trains in front are shifted out of the way, these being the ones that call at wayside halts such as Shenfield, Witham etc.

With new trains it would be an awful lot of money to save 4 mins. Alternatively knock out a stop for free.

General problem is that there is too much traffic for faster speeds.

You might find some of the discussion in this thread useful as well https://www.railforums.co.uk/threads/london-to-norwich-90-min-timings.178937/ and this one https://www.railforums.co.uk/threads/why-is-the-geml-always-closed-on-weekends.195613/
 
Last edited:

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,312
Location
Glasgow
Does anyone know how difficult or expensive an upgrade it would be to get the GEML up to 125mph (and 140mph capable with further upgrades, eg digital signalling)?

I’ve tried searching the forum but can’t find anything.

Thank you

I think it was previously said that there wasn't much point in doing so given the mix of traffic and relatively modest journey time reductions you'd get anyway for the cost.
 

Wapps

Member
Joined
1 Jul 2020
Messages
116
Location
London
Thank you. The thread quoted above is from 2013 and a lot has changed since then (I mean, it seems we are now dropping tilting trains from a line (WCML) that, in 2013, had only just finished being upgraded several years back at the tune of many billions (!) to allow tilting trains to run at 125mph. I digress...).

The checklist above does not seem unsurmontable and when you process each individually, could surely be achieved incrementally over, say, a 10 year period so that we can achieve 125mph. That’s a 25% increase in speed. For the new timetable which has the Norwich - London fast, you would get a material improvement, surely.

By the way, I resent the “it’s only a 4 or 8 min saving” argument. Follow that argument, why not go back to 90mph and lose “just” 4 mins to save some dosh. And then why not go back to 80mph...

My point being that progress is often achieved incrementally, and we should aim for improvement, not more of the same.
 

Darandio

Established Member
Joined
24 Feb 2007
Messages
11,141
Location
Redcar
For the new timetable which has the Norwich - London fast, you would get a material improvement, surely.

The Norwich in 90 is a political vanity project.

By the way, I resent the “it’s only a 4 or 8 min saving” argument. Follow that argument, why not go back to 90mph and lose “just” 4 mins to save some dosh. And then why not go back to 80mph...

It's much more than limited time savings. An increase in speed reduces the headway.
 

Wapps

Member
Joined
1 Jul 2020
Messages
116
Location
London
The Norwich in 90 is a political vanity project.



It's much more than limited time savings. An increase in speed reduces the headway.
Political vanity - tell that to Norwich - London commuters!

I’m sure headway concerns could be mitigated. They have on the WCML, ECML, MML, GWML etc.
 

LAX54

Established Member
Joined
15 Jan 2008
Messages
3,906
There are 14 sets of AHB's between Ipswich and Norwich, and three sets of CCTV crossings, you then have the Peterboro service, and the hourly Cambridge, plus numerous freight paths Ipswich to Haughley, overall I would think it was be a vast waste of money to make it fit for 125mph, and of course the OHl would need an upgrade and complete resignalling from Ipswich to Norwich.
The only Nin90 service that is well used is / was the 1900 out of London, don't think many, if any commuters used it London bound
GEML is really just a big commuter line, even as far as Norwich, 100 min run time, is fine for most that use it, plus of course stops at Diss, Stow, Ips, Mantree & Colchester devalues 125mph
 
Last edited:

apinnard

Member
Joined
2 Aug 2017
Messages
385
Location
Kettering
Wouldn’t get past the cost/benefit analysis. Actually, it wouldn’t even get that far.

Total non-starter.
 

popeter45

Established Member
Joined
7 Dec 2019
Messages
1,492
Location
london
Like the Brighton Main line the GEML is just too short for 125 running to make sense due to acceleration distances
 

306024

Established Member
Joined
23 Jan 2013
Messages
3,974
Location
East Anglia
Design a 140mph Freightliner then it might be worthwhile ;)

To get the maximum capacity out of the 60 mile 2 track section of the GEML from Shenfield to Haughley Jn requires all trains to go at roughly the same average speed. The line is simply too busy to be able to path significantly faster trains on a regular basis without compromising that capacity.

Although no one could foresee Covid, all N90 has achieved in practice is to damage other parts of the timetable, which now remain despite the N90 trains not running.

ETCS between Liverpool St and Shenfield is worthy of consideration for a start, but for both operational and financial reasons, rather than put in the speculative ideas section the main idea belongs in the total fantasy section.
 
Last edited:

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,312
Location
Glasgow
By the way, I resent the “it’s only a 4 or 8 min saving” argument. Follow that argument, why not go back to 90mph and lose “just” 4 mins to save some dosh. And then why not go back to 80mph...

Simply trying to be realistic.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,823
Try this one from 2013 in the first instance
https://www.railforums.co.uk/threads/ic225-for-geml.88110/page-3#post-1534909


General problem is that there is too much traffic for faster speeds.

You might find some of the discussion in this thread useful as well https://www.railforums.co.uk/threads/london-to-norwich-90-min-timings.178937/ and this one https://www.railforums.co.uk/threads/why-is-the-geml-always-closed-on-weekends.195613/

Thanks for digging that out. My memory not being what it was I would have been in danger of writing it all again.

Thank you. The thread quoted above is from 2013 and a lot has changed since then (I mean, it seems we are now dropping tilting trains from a line (WCML) that, in 2013, had only just finished being upgraded several years back at the tune of many billions (!) to allow tilting trains to run at 125mph. I digress...).

The checklist above does not seem unsurmontable and when you process each individually, could surely be achieved incrementally over, say, a 10 year period so that we can achieve 125mph. That’s a 25% increase in speed. For the new timetable which has the Norwich - London fast, you would get a material improvement, surely.

By the way, I resent the “it’s only a 4 or 8 min saving” argument. Follow that argument, why not go back to 90mph and lose “just” 4 mins to save some dosh. And then why not go back to 80mph...

My point being that progress is often achieved incrementally, and we should aim for improvement, not more of the same.

The thing is, insofar as the GEML is concerned, not a lot has changed, excluding current events. What has changed is that we have new trains. This will give 4 minutes (possibly more) for ‘free’ without spending billions - and it would be billions - on the infrastructure.

The point is that a 25% increase in speed does not equal a 25% reduction in journey time, because of the station stops and crucially other trains in the way.

And why not go back to 90mph or 80mph? Because you wouldn’t save anything.

Political vanity - tell that to Norwich - London commuters!

I’m sure headway concerns could be mitigated. They have on the WCML, ECML, MML, GWML etc.

But they haven’t. The headway on those lines is (roughly) the same as it was in 1966, 1990, 1985, and 1976 respectively. The exception being Reading.

The headway on the GEML is effectively 2-3 minutes south of Colchester, and ETCS won’t give you anything better.
 

Alfie1014

Established Member
Joined
27 Jun 2012
Messages
1,205
Location
Essex
Although no one could foresee Covid, all N90 has achieved in practice is to damage other parts of the timetable, which now remain despite the N90 trains not running.

They‘re back in the base plan from December (yay!) as are the other current missing Norwich services. Going to be interesting to see if they all stay in the plan how they’ll cover all the diagrams ,755s cleared to LIV St by December perhaps?
 

pdeaves

Established Member
Joined
14 Sep 2014
Messages
5,932
Location
Gateway to the South West
That’s a 25% increase in speed
The point is that a 25% increase in speed does not equal a 25% reduction in journey time, because of the station stops and crucially other trains in the way.
Agreed, 25% increase in maximum is not anywhere near 25% increase in average. As well as the points Bald Rick has said, the faster you go, the worse the acceleration is, so the harder it is actually to make use of the increased permissible speed. Before you hit the top speed you probably need to apply the brakes for the next stop.

When realigning curves for a faster speed, it is possible that land take is required to get the alignment right.

Once all the constraints are considered, it's probably easier to build a new route on a nice straight alignment with few intermediate stops and little other traffic in the way.
 

306024

Established Member
Joined
23 Jan 2013
Messages
3,974
Location
East Anglia
Once all the constraints are considered, it's probably easier to build a new route on a nice straight alignment with few intermediate stops and little other traffic in the way.

Indeed. HS5, A straight line would see Norwich to Liverpool St with intermediate stations at Bury St Edmunds and Stansted Airport, with an option to add Steeple Bumpstead ;)

Norwich is a fine city, but simply doesn’t generate sufficient revenue to justify any expense. 4 tracking to Colchester would be nice operationally but pigs will fly first.
 

gingertom

Established Member
Joined
19 Jun 2017
Messages
1,335
Location
Kilsyth
the faster you go, the worse the acceleration is
depends on the rolling stock chosen. The 745 has 4 tractioned bogies, no reason, other than financial, why there couldn't be 6, 8 or even 12, which would allow acceleration to continue to a much higher speeds. But this would come at significant cost, not only in capital terms in the cost of the extra traction equipment, but also in running costs, as more motors means more amps. More feeder stations with higher power capability would be required. All to save a couple of minutes? Not going to happen.
 

pdeaves

Established Member
Joined
14 Sep 2014
Messages
5,932
Location
Gateway to the South West
depends on the rolling stock chosen. The 745 has 4 tractioned bogies, no reason, other than financial, why there couldn't be 6, 8 or even 12, which would allow acceleration to continue to a much higher speeds.
Very true, but my statement still holds. More motors and greater energy consumption would make the effect less but it will still be there (resistance increases with square of speed).
 