BantamMenace
Member
- Joined
- 2 Dec 2013
- Messages
- 573
Im in the initially exploratory stages of conducting a university study on the viability of 125mph freight in the UK.
What im looking for is a list of the issues which come with it. I understand these to huge trackwear, decelerating the huge masses safely, lack of capable traction and no perceived market.
What i hope to produce is a study that could provoke thought into a step change from long distance road haulage to more regular timetabled swapbody services between regional hubs without creating huge pathing issues between passenger services.
All thoughts and comments welcome.
What im looking for is a list of the issues which come with it. I understand these to huge trackwear, decelerating the huge masses safely, lack of capable traction and no perceived market.
What i hope to produce is a study that could provoke thought into a step change from long distance road haulage to more regular timetabled swapbody services between regional hubs without creating huge pathing issues between passenger services.
All thoughts and comments welcome.