• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

11 Car Pendo at Dollands Moor

Status
Not open for further replies.

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
My point was that saying they need to be a 'contrasting colour' is not entirely correct.

I admit I made the point badly though :)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

dave59

Member
Joined
28 Jul 2010
Messages
143
Out of interest, what approval does a train need when it is merely two cars longer?!

Good question. Both train and infrastructure are a known quantity so why not just run it in service? Why the lengthy and costly commissioning and the talk of whether the 390 will be "suitable" for the ECML when the railway has the same track, signalling and electrification standards as the WCML?

Why make such a meal of it?
 

Dai.

Established Member
Joined
2 Aug 2008
Messages
1,210
Location
Wales
Good question. Both train and infrastructure are a known quantity so why not just run it in service? Why the lengthy and costly commissioning and the talk of whether the 390 will be "suitable" for the ECML when the railway has the same track, signalling and electrification standards as the WCML?

Why make such a meal of it?


Welcome to the UK! You must be new here?


But I think its safety stuff - You have to check it up against platforms - go over your evacuation plan etc - because its 11 cars not 9 then they need to assess whether it meets safety requirements?

I don't know if this is right, but this is how they work it with new planes.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,951
Location
UK
I can accept this more if there are certain things that have changed on the newer builds, as is common on new planes. Even cars that have had a certain number of changes require new safety testing (which is probably why many refreshes of cars are mainly cosmetic facelifts to save money).

I'd be interested to know what has changed significantly enough for it to be considered necessary to do another safety assessment. Surely evacuating a train isn't something that needs to be tested based on it being 9 or 11-car, anymore than I'd expect trains needing to be tested in different configurations (3/6, 4/8/12 cars). But, I do say that out of total ignorance!!
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,194
Location
0035
And the same way BoJo has taken credit for the ELL, new stock for Overground etc.
Yep, but think of the major transport projects started under the Conservatives and then again those under Labour and see really who has made the biggest difference to our railways, particularly those in the provincial cities whose networks were completely revived and bettered throughout the 80s.
 

SouthEastern-465

Established Member
Joined
24 May 2009
Messages
1,660
Location
Greater London
Someone wrote on my comments on youtube has named the 11 car Pendolino the Extendolino? like that nickname, like with the Class 90 loco hauled known as the Pretendolino

And in my video someone does say Oh B*****ks becuase of two reason, 1st reason is that tthe trains between Rugeley Trent Valley and Birmingham New Street were disrupted becuase of signaalling in the Tame Bridge Parkway area and they canceled Trains if you hear in the video you get an there was an annnouncemnt about, 2nd reason was that he was going to film it or take an photo but was too late to get his camera/camcorder, the Oh B*****ks wasn't planned in the video

No worrys, I found it quite funny actually! :)
 

Bighat

Member
Joined
19 Jul 2005
Messages
429
Location
Ilford
Someone wrote on my comments on youtube has named the 11 car Pendolino the Extendolino? like that nickname, like with the Class 90 loco hauled known as the Pretendolino

And in my video someone does say Oh B*****ks becuase of two reason, 1st reason is that tthe trains between Rugeley Trent Valley and Birmingham New Street were disrupted becuase of signaalling in the Tame Bridge Parkway area and they canceled Trains if you hear in the video you get an there was an annnouncemnt about, 2nd reason was that he was going to film it or take an photo but was too late to get his camera/camcorder, the Oh B*****ks wasn't planned in the video

Say it as you see it! :) :)
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,128
Location
Redcar
Not exactly news this has been known about for some time but at least the press get there eventually.
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
I heard on the news that anyone can submit to lease the new 390. So why don't VT?

They tried... While blackmailing DfT for a franchise extension. DfT won't give an extension, so VT won't lease them. If they wanted brownie points, go ahead and lease them anyway - don't play tit for tat with the bosses!
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,126
Location
Birmingham
They tried... While blackmailing DfT for a franchise extension. DfT won't give an extension, so VT won't lease them. If they wanted brownie points, go ahead and lease them anyway - don't play tit for tat with the bosses!

I think if 390054 is left sitting there into the new year then it is a complete farce. If they are going to comission it on ECML then get the thing going or at least scheduled in ASAP. If not, give it to VT so they can at least put it to use to compliment the existing 390 fleet
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
I think if 390054 is left sitting there into the new year then it is a complete farce. If they are going to comission it on ECML then get the thing going or at least scheduled in ASAP. If not, give it to VT so they can at least put it to use to compliment the existing 390 fleet

Joys of privatisation and "real business" :lol:
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,783
Location
Croydon
They tried... While blackmailing DfT for a franchise extension. DfT won't give an extension, so VT won't lease them. If they wanted brownie points, go ahead and lease them anyway - don't play tit for tat with the bosses!

I think even the normal commisioning work for these new 390s might be significant enough to put Virgin off. But bear in mind they could be more troublesome than most of the original batch of 390s as they are assembled by different staff in a different factory in a different country - not Birmingham.

Given that Virgin have disbanded a 221 so as to make all the rest of their class 221s the same langth I cannot see Virgin being keen on the extra 2 coaches for 32 of the existing 52 9-car 390s.

I seem to recall the manufacturer and Virgin were originally keen on a lengthening project - AFAIK they suggested it !. But that was at a time when the manufacturer had spare capacity and the extra coaches were going to be inserted when the units were due a major exam. Otherwsie it involves significant downtime to re-configure the lenghthened units. The decision makers (Dft or Government) sat on their hands and made no decision :lol:. I presume what is being delivered now is too little (only about 60% of the fleet) and too late (the major exam has already been done) for Virgin to bother with:oops:.

Questions:
1) How big a job was it to extend the lengh of each 390 last time?.
2) Are the current deliveries a delayed version of the original plan/option or are they attempting something completely different at totally the wrong time ?.
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,126
Location
Birmingham
Given that Virgin have disbanded a 221 so as to make all the rest of their class 221s the same langth I cannot see Virgin being keen on the extra 2 coaches for 32 of the existing 52 9-car 390s.

Only 31 of the existing 52 sets will be lengthened under the current proposal (62 new carriages in total) with 4 new 390s of 11 carriages in length (although the original tender says these will be delivered in 9 car form and upgraded which does not appear to have happened with 390054)

http://webarchive.nationalarchives.gov.uk/+/http://www.dft.gov.uk/pgr/rail/pi/pendolinolengthening/tender/main.pdf

Virgin Trains also have the tender to comission the new 390s and extend the existing 31 as well from what I understand. They should all be extended in my opinion
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,783
Location
Croydon
Only 31 of the existing 52 sets will be lengthened under the current proposal (62 new carriages in total) with 4 new 390s of 11 carriages in length (although the original tender says these will be delivered in 9 car form and upgraded which does not appear to have happened with 390054)

http://webarchive.nationalarchives.gov.uk/+/http://www.dft.gov.uk/pgr/rail/pi/pendolinolengthening/tender/main.pdf

Virgin Trains also have the tender to comission the new 390s and extend the existing 31 as well from what I understand. They should all be extended in my opinion

Thanks Geezertronic - very interesting document. I have read as far as Page 8 so far but there are an awful lot of facts given-away/inferred in the Glossary of Terms (pages 5&6). The 31 units to be extended I don’t dispute - I blame my memory for saying 32. Like you say - looks obvious that the extra four 390s were supposed to be delivered as 9-cars and the document even states the advantages of this on page 8 second paragraph after the bullet points.

Conjecture but perhaps Virgin have been put out by discovering that the extra 9-car 390s are turning up as 11-car 390s !. I wonder at what stage Virgin discovered this. I would have thought they would have been far more more use as 9-car 390s.
If it was me, my preferences (in order) would be :
1) Four extra standard length 9-car 390s.
2) Extension of the WHOLE of the existing of the fleet by 2-cars.
3) As per 2) and 1) PLUS extension of the extra four units.
4) Four new 9-car 390s and then extension of 60% of the rest of the fleet !. The new 390s could be put straight into service to cover other 390s being out of service. With no pressure to lengthen the older 390s quickly.
5) Four new 11-car 390s and then extension of 60% of the rest of the fleet !.
My guess is that the Dft realised the attractiveness of only accepting part 1 above and so "encouraged" Virgin to take on the extension of 60% of the existing 390s by making sure the extra four 390s started life as 11-car units !. The Dft probably underestimated Virgin's unwillingness (my conjecture) to take on the lengthening project let alone for only part of the fleet. So Virgin saw red.

In other words, like you (Geezertronic), and most of the rest of the sane world we want a standard set of units. I also noted year(s) ago that the Four new 11-car 390s require 44 coaches. This was exactly the right number of coaches to extend the remaining 40% of the fleet. Well until one was written of at Grayrigg. I doubt if this fact escaped Virgin !.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,312
Virgin Trains also have the tender to comission the new 390s and extend the existing 31 as well from what I understand. They should all be extended in my opinion

'Virgin Rail Projects' have the contract (not the tender) to commission the new 390s. Legally a separate company to Virgin Trains. Part of the DfT's grand plan to ensure that Virgin Trains didn't have a direct responsibility for the job I guess...
 

Geezertronic

Established Member
Joined
14 Apr 2009
Messages
4,126
Location
Birmingham
'Virgin Rail Projects' have the contract (not the tender) to commission the new 390s. Legally a separate company to Virgin Trains. Part of the DfT's grand plan to ensure that Virgin Trains didn't have a direct responsibility for the job I guess...

I realised that after I posted the comment but I couldn't find a decent source that said the exact name (I assumed it was Virgin Rail Group but that would have been wrong too). Thanks for clearing that up :)
 

IanPooleTrains

Established Member
Joined
21 Nov 2010
Messages
1,217
Location
Brereton, Rugeley, Staffordshire
Just to give you an update on 390054 and it's three stepsisters.

390054 will now be undergoing a six month testing and commissioning session and the set will then be available for leasing

As for 055, 056 and 057, they will be delivered into the Uk as of January, August and December of 2012

The integration of the additional carriages will be starting as of April 2012
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
Just to give you an update on 390054 and it's three stepsisters.

390054 will now be undergoing a six month testing and commissioning session and the set will then be available for leasing

As for 055, 056 and 057, they will be delivered into the Uk as of January, August and December of 2012

The integration of the additional carriages will be starting as of April 2012

Something I read somewhere, not sure seem to suggest that the adding of the additional carriages would be complete by 2016. Is this correct?
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
This moved to Longsight yesterday behind 57314 via Hunts Cross and is returning on Sunday. Anyone know of timings for Sundays move?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,312
Something I read somewhere, not sure seem to suggest that the adding of the additional carriages would be complete by 2016. Is this correct?

Bit late this, but no. The extension of the existing trains is supposed to be taking 9 months, start April 2012 completing Dec 2012. It's in the table on page 9 of the ITT linked to by 'geezertronic' earlier.
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
Moving back tonight to Edge Hill;

Longsight 2211
South Parkway 2315
Edge Hill 2323
 
Status
Not open for further replies.

Top