I'm not sure when the track was last relaid in Paddington, however age of track shouldn't be a big issue if the correct maintenance standards are adhered to.
It was only booked as far as the temporary stop block. That's why pilotman working was used. Had it gone all the way then the train staff would have used.
It was never going to go all the way to Tyherington. It was only planned to go as far as the temporary stop block as the line is still officially out of use.
I've done a few of these! Disc cut off the MGL pins then with a wedge and a hammer remove the broken plates. Use scrapers and if possible a welders needle Hun to clean of the insulation and git a pair of Benkler 6 hole Insukated plates and an end post, give the joint a good pack and run trains...
Nothing can be down without the signaller. Even if we can't "see" where anything is. Contrail and ground staff are involved but it's still the signaller who issues any authority for a train to move.
Temporary block working can be used if it's practical to set up. Needs a lots of staff, much clamping of pints and level crossing attendants if required, but it can be done. I've been involved with it from out on the ground as a handsignalman and as a signaller, that's when you really earn your...
I always used PLOD when Patrolling and Inspecting. If you didn't/couldn't use then you set up the appropriate lookouts for movements in both directions. Whilst there is a push to make everything green zone working it was always good to see trains passing over the track to give a view of voiding...
I just find it staggering just how difficult and political it's become just to get this line open again. Clearly a demand for it, I commute from Portishead to Didcot and it takes me longer on the bus from Portishead to Temple Meads than it does from Temple Meads to Didcot! All the powers...
As the adjustment switches are correctly set up I would and I always did go the 180 metres. It sounds like the track is a proper mixture of components! I would always inspect the length form the adjustment switch to the anchor point to check the correct clips are fitted and the condition and for...
I was taught 180 meters, what pandrol fastenings are they? (401a, e Etc) and have the adjustment switches been measured for the correct overlap measurements before doing anything? It's cwr on one side of the adjustment and jointed on the other?
It is not always possible to foresee and alter the decision that ARS will make for every train. It is sometimes a data error, sometimes we may be dealing with something on another part of the worktation. It may even be due to a line bloackage. So many reasons. I work the Swindon desk and I can...
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.