Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Have just made my first visit to the TL platforms at St Pancras in many years. Had to wait a while for my train and noticed the incredibly loud screeching noise trains in both directions were making, to the point my ears were ringing after each train left.
I used to commute to STP regularly...
These days on a typical weekday there are about 22,000 passenger trains in the timetable (24,000 odd pre-Covid). Does anyone know roughly what the equivalent figure would have been at the pre-Breching peak?
Llandudno and Llandudno Junction lie on the same line but are separated by an intermediate station for a different place (Deganwy). What other examples of this are there on the network? Any journey requiring changes/connections does not count
The up platform at Chessington South has never been used, due to the extension of the line being cancelled after WW2. What other examples are there on the network?
From Epsom I can take either an SWR or Southern to Clapham Junction. Between Epsom and Clapham the trains do not pass through any locations in common. How many other examples of this where trains start at a common location, take different routes and then pass through a common location again...
Today, SWR was running trains from Waterloo to Reading via Wimbledon, reversing at Virginia Water. The PSA actually announced two consecutive stops at Virginia Water (at different platforms), as reflected by the timetable:
http://www.realtimetrains.co.uk/train/W91570/2019/04/07
Just...
With all the issues that the the class 345 and 710s have experienced, how likely are the new Class 701 trains (which are pretty much a clone of the above) to be delivered from Summer 2019 as planned?
Some journeys between stations on the current NR network used to be much quicker due to now-closed lines. Which journey has been slowed down the most?
A few possibilities:
Waterloo to Waterloo East
Alton to Winchester
Hertford East to Hertford North
Blackpool North to Preston
Uckfield to Lewes
Which lines would be so hard to reinstate (from an engineering/construction point of view) that even the most ardent of crayonistas wouldn’t claim it was possible?
Some suggestions
- Westerham branch - now part of the M25!
- Bedford-Cambridge (original alignment), now has housing, a cycle path...
I’ve just renewed my Z1-6 Annual to Travelcard, which I use to travel to work in Central London via the Chessington branch. It was bought before the SWR franchise change so the old Passenger’s Charter/ Void days regime applies.
For the first (and last given Delay Repay now applies) time ever...
Why have Class 7xx and 8xx numbers been used for new units in recent years when there are plenty of unused numbers in the 3xx and 4xx ranges? Will there ever be any more new units numbered in these ranges?
Is there supposed to be any differentiation between an 8xx and a 7xx?
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.