• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. Legolash2o

    How to get signal data

    If you would like some historical data, send me a Direct Message. A days worth of signal data is about 600-700MB but happy to send a few days worth. Some documentation: https://wiki.openraildata.com/index.php?title=TD
  2. Legolash2o

    Electrification threads and resources index

    Thanks for the updates. I will update the maps and publish. The latest publish already has the Wigan route. I'm also tempted to see how much percentage just that route alone added the the electrification total.
  3. Legolash2o

    North Somerset Railway in 2025

    As a developer myself, I set copyright dates to always show the current year.
  4. Legolash2o

    Wigan-Bolton electrification. Construction updates only please

    Don't they know it's bad to have an extension lead on an extension lead? I'll see myself out. On a serious note, shame a out the theft and hope it hasn't delayed the love date too much.
  5. Legolash2o

    Why do some passengers not get how annoying it is to play music and videos out loud?

    I was on the train with an iPad once and thought it was coming through headphones but actually was coming out of the iPad. The conductor did ask me to use the headphones. I quickly apologised and made sure they were plugged in. It has been a long day. I have also heard conductors asking other...
  6. Legolash2o

    Wigan-Bolton electrification. Construction updates only please

    The one post I happened to miss. Sorry!
  7. Legolash2o

    Wigan-Bolton electrification. Construction updates only please

    Apparently. It will go live/energised 1st January. https://www.theboltonnews.co.uk/news/24777283.bolton-wigan-rail-electrification-go-live-january-1/
  8. Legolash2o

    Transpennine Route Upgrade and Electrification updates

    I should update my TRU maps with lots of these details. https://gbrailwaydata.co.uk/Public/TRU
  9. Legolash2o

    Transpennine Route Upgrade and Electrification updates

    Is Leeds Neville Hill a big change? I always think back to the videos where they blitz a place in a 48-72 hour run when I think about timeframes. Just have to remember that not all projects are like that. Ooo, good point!
  10. Legolash2o

    Transpennine Route Upgrade and Electrification updates

    How does it take 5 years to electrify a route such as Leeds to Church Fenton considering they seem to be throwing up masts quite rapidly? 2 years-ish, sure but 5? Sorry if dumb question.
  11. Legolash2o

    EU Loading Gauge Coordinates

    This is great, thanks! Is it worth having both the static and the kinetic? I've just done static ones for now.
  12. Legolash2o

    EU Loading Gauge Coordinates

    Thanks hwl, I managed to add GA and GB. Just missing GB+ and GC. Thanks for the feedback. I will see what I can do about the ordering.
  13. Legolash2o

    EU Loading Gauge Coordinates

    I've created an interactive loading gauge tool but I'm struggling to find coordinates for GA, GB, GB+, GC. Can anybody please point me in the right direction? I've also noticed than W9, W10 and W12 gauges start at different heights. Is that normal? Do they fit in the wagon differently, even if...
  14. Legolash2o

    Gradient post: level to 1 in 60

    I searched in my database for ERLs that both have level and 60. I've only had time to check AAV but thought I would share a potential candidate list. I will come back later and check the rest when I get a chance. AAV - Does have a 60 next to a level ANI2 ATH...
  15. Legolash2o

    Electrification threads and resources index

    I've updated the electrification map which can be found below. https://gbrailwaydata.co.uk/Public/ElectrificationMap
  16. Legolash2o

    Transpennine Route Upgrade and Electrification updates

    How congested is that section?
  17. Legolash2o

    Transpennine Route Upgrade and Electrification updates

    Thanks for this info! I shall update my maps accordingly. Any sections with piling I tag as under construction.
  18. Legolash2o

    Transpennine Route Upgrade and Electrification updates

    How much piling work is going on between Leeds and Micklefield please? I read that there's some between Garforth and Micklefield but is there any between Garforth and Leeds?
  19. Legolash2o

    Timetabling Software

    Hi, I have various route viewing tools that let's a user put in A to Z via B, C and D. It then shows route capability such as gauges, stock clearances, electrification and other information. The plan would be to then allow a user to export the route tiplocs to a PEX/PIF file for them to do...

Top