• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. B

    Northern new rolling stock - what would you have ordered?

    I was thinking that my new bi-modes would be taking over double-set commuter 156 services, but 155 replacement perhaps not a priority I was thinking additional 319s would have been the original plan, revised to all the 323s and perhaps 365s or 379s once it became clear that they were available...
  2. B

    Northern new rolling stock - what would you have ordered?

    I think I would have gone for an all bi-mode, commuter-spec (relatively high-density seating, perhaps like 707s with wide central aisle for standing and/or some areas of 3+2), doors at thirds with large standbacks, fast acceleration, with gangway doors. This would then allow the 170s and 158s to...
  3. B

    Trivia: Largest town/city that isn't served by more than one major city

    I was wondering about Falmouth for the largest in the SW, but was surprised to find that Barnstaple is larger
  4. B

    Trivia: Largest town/city that isn't served by more than one major city

    As well as Luton, mentionned above, the Medway Towns connobation is over 200k
  5. B

    Out with credit-card sized stock and in with mobile ticketing - is it too early?

    I do think its a shame that there isn't a consistent option to be able to easily register an e-ticket to an email address, so that in the unlikely event that a phone runs out of battery / gets lost / disolves in a flood of condensation from a poorly fitting window, it would be possible to give...
  6. B

    HS2 frequency to remain at 18 trains per hour confirms minister

    It would seem more likely that the Lancaster service would be extended to these stations if an HS2 service to them was needed. Alternatively the second Liverpool could have another portion detach at Crewe, rather than use the extra path.
  7. B

    Ideas for provision if disused railways are reopened on the Isle of Wight

    There is a simple solution to the ban on extending 3rd rail - simply fit the D-trains with small nuclear reactors. Zero carbon footprint, and probably just as likely to ever see light of day as any extension on the IOW :)
  8. B

    High Speed Rail Scotland

    True, but its presumably all a balance. When there used to be Plymouth - London flights, I sometimes used them to connect at Gatwick, but when they were poorly timed I would get the train or drive.
  9. B

    High Speed Rail Scotland

    HS2 could also capture some of the connecting air market, as it is likely to mean a reduced choice of connecting flights. If there are (normal world) say 10 BA flights per day from Edinburgh - Heathrow, and 33% of that capacity is used for connections, 33% is for people who transfer to rail...
  10. B

    RAIB: Fatal accident on WCML near Roade 8/4/20

    I wonder if there is any that a fail-safe electronic system could be put in place. I'm imagining something like an app on the workers' phones, that monitors their GPS position, and alarms (sound/vibrate/flashing light) when a train is approaching a signal section that runs within X meters to...
  11. B

    Zipabout Connect enabling NRE to re-route passengers during disruption

    Something like this app could be a great way to deal with reasonableness. It would be fairly simple to write a set of 'reasonableness' rules for a piece of software to decide if the current level of delay for your journey is reasonable, and then allow it to re-route you, with the confirmation...
  12. B

    If BA leaves Gatwick, could this be the end of GTR's 'Gatwick Express' route?

    Really, no! The BML needs to have entirely full-length trains that are not carrying fresh air. Combining all the GatEx services into express Brighton or other services seems like by far the best solution. Half hourly airport services really isn't good enough, they should be turn up and go...
  13. B

    Night Riviera - speculate on new coaches and their viability

    True. If it got down to 3hrs then it might be a different matter.
  14. B

    Night Riviera - speculate on new coaches and their viability

    Is demand for the lowland sleeper likely to reduce once HS2 Phase 2b is up and running? Especially if improvements are also made on the north WCML. Faster journey times from Glasgow and Edinburgh would make an earlier arrival in London practical with a not too antisocial start from Scotland...
  15. B

    The last slam door trains in public service

    I always think that reasonable risk is a combination of likelihood, consequence and also benefit. This is why it could be considered more reasonable to cycle to the station, which has a greater likelihood of harm, but provides significant benefit (exercise, low cost travel etc), compared with a...
  16. B

    My idea for a South East London Tram

    I was thinking go from Bromley town centre (not Bromley South) down Church Road, Glassmill Lane, Queensmead road and station road around the open space, calling at Shortlands Station, then either an extra track alongside the railway alignment to Beckenham Junction, or along Abermarle Street. I...
  17. B

    My idea for a South East London Tram

    Would it make sense to extend it to Beckenham Junction or Elmers End and link it to the Croydon system? Although it would be too far for long through journeys from Thamesmead to Wimbledon, journeys like Eltham to Croydon could be useful, and a single network might make things like depots...
  18. B

    HS2 open access

    Oh definitely. But I think that the hs2 possibility is an interesting topic as well
  19. B

    HS2 open access

    Before anyone else mentions it, I can certainly imagine that HS2 will open up open access opportunities on the WCML as well.
  20. B

    HS2 open access

    I believe that one of the biggest constraints on HS2 capacity is the capacity of Euston Station and its throat. Looking at the plans for Old Oak Common (OOC) Station, with its 6 HS2 platforms, it occurred to me that it might be straightforward to terminate some trains here. With good onward...

Top