• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. S

    Class 769 for London Gateway freight trial

    Time to buy a pair of binoculars! Lol
  2. S

    Class 769 for London Gateway freight trial

    Anyone else look at that and get a massive throw back / shivers down your spine? Reminds me of being a kid and going to scary London on a 319 like an adult! Glad they haven another life tho. Decent units.
  3. S

    Class 769 for London Gateway freight trial

    True it won't be that busy but still why use something risky in a public place? Just use roll cages as much as you can. On their website the stated journey time is 1 hour. Leaving approx an hour to turn the train around at Liverpool Street. For an 8 carriage train, sounds doable. Speed is...
  4. S

    Class 769 for London Gateway freight trial

    I know they wouldn't be there all at one time but as you said it get millions of people a week / month / year. I'm quite excited by the proposals and want them to succeed, I just think it won't be a smooth journey. There are 2 daytime paths that they want, i think I read that earlier in the...
  5. S

    Class 769 for London Gateway freight trial

    Smart and efficient use! Didn't know that was possible but makes sense as they are basically the same trains but one with a diesel engine as well.
  6. S

    Class 769 for London Gateway freight trial

    Because people do silly things and its dangerous. Personally, i can't imagine a heal and safety executive being thrilled to sign off a forklift truck being used at a busy station with millions of people.
  7. S

    Class 769 for London Gateway freight trial

    No I'm just being real. Its not as simple as it seems. Also my point was about riller balls on the platforms. There wouldn't be space for a permanent set up in many stations. You'd need a siding with a purpose built facility / platform
  8. S

    Forum upgrade complete

    OK, thank you. Could any willing forum staff please message me?
  9. S

    Forum upgrade complete

    Is there the option to change your user name? I'm board of my name
  10. S

    Death knell for high floor UK trains - All new trains to be low floor level access roll-on-roll-off for wheelchairs, buggies, prams, pushchair and mor

    Not everyone in a wheelchair stays in the chair. My partner loves to sit in a normal seat. Further, the person who accomponies that person may want the bigger seats. I get your point about the freebies, they are definitely not worth it. So obviously not everyone in a wheelchair would pay more...
  11. S

    How can the railway cut operational expenditure?

    I've been told before that they're busy and my partner didn't book so struggle on your own.
  12. S

    How can the railway cut operational expenditure?

    Thinking about it, a long term strategy for reducing costs is to have level boarding. That way passenger assist has less demand so you don't need as many staff.
  13. S

    Death knell for high floor UK trains - All new trains to be low floor level access roll-on-roll-off for wheelchairs, buggies, prams, pushchair and mor

    It certainly was. But even GA messed up their FLIRTS because theres no space for a wheelchair passenger in first class. We're plain awful at buying trains or doing a proper internal layout is my conclusion.
  14. S

    How can the railway cut operational expenditure?

    Don't you think disabled people have had it tough enough over the last 10 uears?? Yes the Elizabeth line will be DOO. I just hope it has level boarding....
  15. S

    Death knell for high floor UK trains - All new trains to be low floor level access roll-on-roll-off for wheelchairs, buggies, prams, pushchair and mor

    I'm going to say it: Disabled people being able to easily use the train network died when Driver Only started. Should have started making the network more accesible through level boarding years ago!
  16. S

    How can the railway cut operational expenditure?

    Disabled people at unstaffed stations getting very angry... Trying to resist going on a rant about this in the "death kneel for high floored trains thread"!
  17. S

    How can the railway cut operational expenditure?

    Digital predictive maintenance is the only meaningful way I can think of reducing costs across the whole network. But that would require a lot of investment that realistically the treasury wont have at the moment.

Top