• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. O

    321s to Norwich

    After Traveling back to Norwich Late at Night on Friday, At Diss there appered to be a 4 Car Class 321 waiting at Diss Station operating the 2305 Greater Anglia Service from Norwich to Ipswich. This got me wondering weather this is a regular occurrence and also wether there are any more diagrams...
  2. O

    Greater Anglia Relivery/Refresh

    Hi, Just Wondering if anybody knows all the trains which will be Relivered/Refreshed in the Greater Anglia Franchise.Thanks
  3. O

    The Titfield Thunderbolt - 23/06/12

    Does Anyone Know when it will leave Norwich to go to Holt?
  4. O

    My idea for Stansted Express Norwich?

    I think it is about 4 but I am not to Sure :|
  5. O

    My idea for Stansted Express Norwich?

    Hi, wandering wether having a Stansted Express Service to Norwich would be viable, with the Ely North Junction set to be Upgraded and High demand for the Norwich - Cambridge route, Would it be possible to Intergrate this Service into a Half Hourly Norwich - Cambridge Service with an hourly...
  6. O

    Not so Greater Anglia

    Personally, I think that Greater Anglia have done more in 4 months than NXEA have done in 4 Years, there trains are in better condition after years of neglect. Take the Class 170's for example, they were filthy and in poor condition under NXEA but now they are cleaner and in much better...
  7. O

    2 Class 317/7s at Ilford depot

    Hi, I went to London Last week and when we passed Ilford depot I Saw 2 Class 317/7s in a Siding there. As I understand I thought these trains were put into storage, If so are they beeing stored at Ilford If not what are they doing there? Thanks
  8. O

    How to get a google Earth map onto Railworks 3 Editor

    Hi I am thinking about building a route on Railworks 3 from Ely to Cambridge. But I have seen that you can get google maps on the Editor to place track, Buildings etc. If Anybody knows how to do this I would appreciate your help Thanks :)
  9. O

    Breckland Line Electrification

    Problem with electrifying that route is that there are not many 2 car EMUs around
  10. O

    Breckland Line Electrification

    Although Saying that the Breckland line, the Ipswich to Ely and Cambridge line and the Felixstowe to Ipswich line Would be good for both Freight and Passengers but Other Branch lines are better off with DMU's
  11. O

    Breckland Line Electrification

    Ideally 6 car class 170s would be best for this service
  12. O

    Breckland Line Electrification

    Yeah move it to infrastructure
  13. O

    Breckland Line Electrification

    Norwich – Thetford 27 Mins Thetford – Ely 22Mins Ely to Cambridge 16 Mins Cambridge – Liverpool Street 1h 08 Mins Total Time: 2h 13 Mins So it is approximately 18 minutes slower than the Great Eastern Main Line.
  14. O

    Breckland Line Electrification

    Even without electrification a half hourly cambridge to Norwich service with an extension to Stansted airport would be easy enough
  15. O

    Breckland Line Electrification

    Hi I think the Breckland line should be electrified because it would make leeway for class 317/321/379 to operate to cambridge and stansted Airport from Norwich. Also It could introduce a hourly Kings Cross to Norwich service using 317/321/365s

Top