• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. Joseph_Locke

    Other trains using HS2/Eurotunnel track and vice-versa, and train-specific lines?

    It's never closed to M6 traffic, and everyone pays. It is a unprofitable private road so why would they take pity on anyone?
  2. Joseph_Locke

    Other trains using HS2/Eurotunnel track and vice-versa, and train-specific lines?

    To expand The Planner's answer, it is because a) they won't be able to go fast enough to avoid delaying HS2's trains and b) they wan't be able to use HS2's platforms because HS2 is being built to a different gauge altogether ... ... and they'd have to be fitted for ERTMS / ATO, which is never...
  3. Joseph_Locke

    How does Network Rail work out max speeds?

    EPS, though technically it applies to 221 and 390, but its close to one class!
  4. Joseph_Locke

    New edition of Ellis' British Railway Engineering Encyclopaedia

    I've just been sent a link to this: https://www.amazon.co.uk/gp/product/0244815402/ Also available (cheaper) at Lulu One for the enthusiast's Christmas stocking?
  5. Joseph_Locke

    What is the length of railway lines in London?

    ORBIS is dead. Long live ORBIS. A truly silly question is one asked twice .... Anyway, the answer is one. OP didn't specify a unit, so I'm answering in units of (length of railway in London)
  6. Joseph_Locke

    Forbidden from using power socket in station waiting room

    If that is how you choose to interpret it.
  7. Joseph_Locke

    Cogload Junction Engineering

    No PAL in those pictures! PAL was the one that came in bits, with a separate power pack.
  8. Joseph_Locke

    Forbidden from using power socket in station waiting room

    And yet the 14/15 satellite lounge at Manchester Piccadilly not only has sockets clearly marked for public use, but also USB sockets and a shelf on which to place the device being charged ... #betterupnorth
  9. Joseph_Locke

    Cogload Junction Engineering

    Pretty Awful Lifting?
  10. Joseph_Locke

    Cogload Junction Engineering

    They're French kit, so PEM will be Portique something du Manutention and LEM Lorrey something du Manutention
  11. Joseph_Locke

    What is this added to running rails?

    Check rails are designed to be in contact with the wheel backs, guard rails are placed further away from the running rail(s) and are there to manage the path of a derailed train. It is completely possible to have one guard rail; this situation existed on the Down Oxford Road (P14 line) at...
  12. Joseph_Locke

    Bullhead rail

    BH is only expensive to buy because the market is so small it isn't worth big regular rolling runs. Relaying in FB isn't automatically better, but on NR lines will allow the conversion from jointed to CWR.
  13. Joseph_Locke

    Changing cant?

    Mathematically, an angle is the sound way to do it, as measuring the elevation of one rail over the other ignores the issue that the adjacent side of the triangle gets shorter. However, marking degrees up on sleepers (at any reasonably small increment) would require fractions and the error is...
  14. Joseph_Locke

    How does Crewe Basford Hall operate?

    Hmm, day-to-day is just the usual glow-in-the-dark stuff, but there may be others ...
  15. Joseph_Locke

    Trivia: Lowest EPS speed limit on the network

    It can't be lower than 50, as that is the lowest speed the tilt/TASS system is specified for.
  16. Joseph_Locke

    How does Crewe Basford Hall operate?

    Badly, as it doesn't have many (any?) 800m through lines that aren't the Independents. Also, AN other freight operator has some secluded sidings dealing with special cargo. Some NR high output plant (HOBC / TRT) is based there too.
  17. Joseph_Locke

    Milton dust - ?

    Spot on, thanks!
  18. Joseph_Locke

    Milton dust - ?

    OK, I know its probably some kind of sand-sized blanketing material used (historically ) for clay digs, but any other information gratefully received! Ta in advance ...
  19. Joseph_Locke

    Design requirements applicable for line speeds and gross axle tonnage

    That isn't completely true - the NR standards allow for quite a variation, away from the "Main" lines, which is getting back to the OP's question. Specifying for the WCML Fasts at Wembley is easy, the interesting bits are ones to St Albans and Colne.
  20. Joseph_Locke

    solar panels on sticks - between Applerley Junction and Guiseley

    Or a wind turbine on this forum ... :rolleyes:

Top